IAC Assessment: OR0622
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0622
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2013
Principal Product Fiber Cement Siding
NAICS 321219 - Reconstituted Wood Product Manufacturing
SIC 2493 - Reconstituted Wood Products
Sales $10,000,000-$50,000,000
# of Employees 64
Plant Area (Sq.Ft.) 170,000
Annual Production 39,000 Thousand Feet
Production Hrs. Annual 8,064
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $419,912 8,736,000 kWh $0.05
Electricity Demand $275,010 33,808 kW-months/year $8.13
Electricity Fees $31,226 - $ -
Natural Gas $270,049 76,688 MMBtu $3.52
TOTAL ENERGY COSTS $996,197
RECOMMENDED SAVINGS* $35,959 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$9,626
Cost:
$1,814
$747 14,718 - - $8,879 2,225 - - - - $747
14,718
kWh
-
-
kW-months/year
$8,879
2,225
MMBtu
-
-
$
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$10,631
Cost:
$10,763
$8,604 169,466 $2,027 244 - - - - - - $8,604
169,466
kWh
$2,027
244
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$8,423
Cost:
$20,917
- - - - $8,423 2,111 - - - - -
-
kWh
-
-
kW-months/year
$8,423
2,111
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,279
Cost:
$15,410
$3,907 76,953 $1,536 185 - - $(-102) - $1,938 - $3,907
76,953
kWh
$1,536
185
kW-months/year
-
-
MMBtu
$(-102)
-
$
$1,938
-
$
TOTAL RECOMMENDED Savings:
$35,959
Cost:
$48,904
$13,258 261,137 $3,563 429 $17,302 4,336 $(-102) - $1,938 - $13,258
261,137
kWh
$3,563
429
kW-months/year
$17,302
4,336
MMBtu
$(-102)
-
$
$1,938
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost