IAC logo
IAC Assessment: OR0626
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0626
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2014
Principal Product Frozen Vegetables, Grains, Legumes, and Fruit
NAICS 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037 - Frozen Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 83,000
Annual Production 1 Units
Production Hrs. Annual 6,432
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $422,199 9,317,000 kWh $0.05
Electricity Demand $198,839 24,535 kW-months/year $8.10
Electricity Fees $34,634 - $ -
Natural Gas $250,731 52,156 MMBtu $4.81
TOTAL ENERGY COSTS $906,403
RECOMMENDED SAVINGS* $50,753 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$18,202
Cost:
$6,792
- - - - $18,202 4,283 - - - - -
-
kWh
-
-
kW-months/year
$18,202
4,283
MMBtu
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,945
Cost:
$1,000
$1,567 32,895 $378 46 - - - - - - $1,567
32,895
kWh
$378
46
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$11,422
Cost:
$7,219
$2,361 49,561 - - $9,061 2,132 - - - - $2,361
49,561
kWh
-
-
kW-months/year
$9,061
2,132
MMBtu
-
-
$
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$7,138
Cost:
$5,500
$5,444 114,278 $1,694 205 - - - - - - $5,444
114,278
kWh
$1,694
205
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$5,445
Cost:
$6,461
- - - - $5,445 1,281 - - - - -
-
kWh
-
-
kW-months/year
$5,445
1,281
MMBtu
-
-
$
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,138
Cost:
$5,659
- - - - $3,138 738 - - - - -
-
kWh
-
-
kW-months/year
$3,138
738
MMBtu
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,463
Cost:
$3,437
$2,468 51,809 $886 107 - - $119 - $(-10) - $2,468
51,809
kWh
$886
107
kW-months/year
-
-
MMBtu
$119
-
$
$(-10)
-
$
TOTAL RECOMMENDED Savings:
$50,753
Cost:
$36,068
$11,840 248,543 $2,958 358 $35,846 8,434 $119 - $(-10) - $11,840
248,543
kWh
$2,958
358
kW-months/year
$35,846
8,434
MMBtu
$119
-
$
$(-10)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost