Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2014 |
Principal Product | Frozen Vegetables, Grains, Legumes, and Fruit |
NAICS | 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing |
SIC | 2037 - Frozen Fruits And Vegetables |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 83,000 |
Annual Production | 1 Units |
Production Hrs. Annual | 6,432 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $422,199 | 9,317,000 | kWh | $0.05 |
Electricity Demand | $198,839 | 24,535 | kW-months/year | $8.10 |
Electricity Fees | $34,634 | - | $ | - |
Natural Gas | $250,731 | 52,156 | MMBtu | $4.81 |
TOTAL ENERGY COSTS | $906,403 | |||
RECOMMENDED SAVINGS* | $50,753 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $18,202 Cost: $6,792 |
- | - | - | - | $18,202 | 4,283 | - | - | - | - |
- - kWh |
- - kW-months/year |
$18,202 4,283 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,945 Cost: $1,000 |
$1,567 | 32,895 | $378 | 46 | - | - | - | - | - | - |
$1,567 32,895 kWh |
$378 46 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $11,422 Cost: $7,219 |
$2,361 | 49,561 | - | - | $9,061 | 2,132 | - | - | - | - |
$2,361 49,561 kWh |
- - kW-months/year |
$9,061 2,132 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $7,138 Cost: $5,500 |
$5,444 | 114,278 | $1,694 | 205 | - | - | - | - | - | - |
$5,444 114,278 kWh |
$1,694 205 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $5,445 Cost: $6,461 |
- | - | - | - | $5,445 | 1,281 | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,445 1,281 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,138 Cost: $5,659 |
- | - | - | - | $3,138 | 738 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,138 738 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,463 Cost: $3,437 |
$2,468 | 51,809 | $886 | 107 | - | - | $119 | - | $(-10) | - |
$2,468 51,809 kWh |
$886 107 kW-months/year |
- - MMBtu |
$119 - $ |
$(-10) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $50,753 Cost: $36,068 |
$11,840 | 248,543 | $2,958 | 358 | $35,846 | 8,434 | $119 | - | $(-10) | - | $11,840 248,543 kWh |
$2,958 358 kW-months/year |
$35,846 8,434 MMBtu |
$119 - $ |
$(-10) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost |