IAC logo
IAC Assessment: OR0630
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0630
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2014
Principal Product Bus Components
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 114
Plant Area (Sq.Ft.) 97,250
Annual Production 16,354 Units
Production Hrs. Annual 4,250
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $325,863 4,882,599 kWh $0.07
Electricity Demand $19,843 10,229 kW-months/year $1.94
Electricity Fees $4,933 - $ -
Natural Gas $162,582 19,749 MMBtu $8.23
TOTAL ENERGY COSTS $513,221
RECOMMENDED SAVINGS* $38,583 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $37,509
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$4,792
Cost:
$500
$4,529 68,112 $263 136 - - - - - - $4,529
68,112
kWh
$263
136
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$1,503
Cost:
$1,500
- - - - $3,003 550 - - $(-1,500) - -
-
kWh
-
-
kW-months/year
$3,003
550
MMBtu
-
-
$
$(-1,500)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$29,588
Cost:
$175,982
$21,303 320,348 $1,650 851 - - $455 - $6,180 - $21,303
320,348
kWh
$1,650
851
kW-months/year
-
-
MMBtu
$455
-
$
$6,180
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,626
Cost:
$500
$1,564 23,513 $62 32 - - - - - - $1,564
23,513
kWh
$62
32
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,074
Cost:
$6,924
- - - - $1,074 197 - - - - -
-
kWh
-
-
kW-months/year
$1,074
197
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$38,583
Cost:
$185,406
$27,396 411,973 $1,975 1,019 $4,077 747 $455 - $4,680 - $27,396
411,973
kWh
$1,975
1,019
kW-months/year
$4,077
747
MMBtu
$455
-
$
$4,680
-
$
TOTAL IMPLEMENTED Savings:
$37,509
Cost:
$178,482
$27,396 411,973 $1,975 1,019 $3,003 550 $455 - $4,680 - $27,396
411,973
kWh
$1,975
1,019
kW-months/year
$3,003
550
MMBtu
$455
-
$
$4,680
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost