IAC Assessment: OR0644
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0644
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2015
Principal Product Titanium Castings
NAICS 331410 - Nonferrous Metal (except Aluminum) Smelting and Refining
SIC 3339 - Primary Nonferrous Metals, Nec
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 130,000
Annual Production 1,125,686 Units
Production Hrs. Annual 7,478
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $835,179 15,212,736 kWh $0.05
Electricity Demand $169,988 34,691 kW-months/year $4.90
Electricity Fees $2,737 - $ -
Natural Gas $184,621 37,740 MMBtu $4.89
TOTAL ENERGY COSTS $1,192,525
RECOMMENDED SAVINGS* $728,680 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $146,773
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$456,074
Cost:
$95,650
$1,282 23,357 - - - - - - $454,792 - $1,282
23,357
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$454,792
-
$
02: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$122,402
Cost:
$38,517
- - - - $122,402 26,408 - - - - -
-
kWh
-
-
kW-months/year
$122,402
26,408
MMBtu
-
-
$
-
-
$
03: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$106,634
Cost:
$72,750
- - - - - - $106,634 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$106,634
-
$
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$37,274
Cost:
$20,400
$34,151 622,061 $3,123 637 - - - - - - $34,151
622,061
kWh
$3,123
637
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,431
Cost:
$1,600
$8,231 149,923 - - - - $(-4,800) - - - $8,231
149,923
kWh
-
-
kW-months/year
-
-
MMBtu
$(-4,800)
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,865
Cost:
$3,865
$2,555 46,531 $310 63 - - - - - - $2,555
46,531
kWh
$310
63
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$728,680
Cost:
$232,782
$46,219 841,872 $3,433 700 $122,402 26,408 $101,834 - $454,792 - $46,219
841,872
kWh
$3,433
700
kW-months/year
$122,402
26,408
MMBtu
$101,834
-
$
$454,792
-
$
TOTAL IMPLEMENTED Savings:
$146,773
Cost:
$97,015
$36,706 668,592 $3,433 700 - - $106,634 - - - $36,706
668,592
kWh
$3,433
700
kW-months/year
-
-
MMBtu
$106,634
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Raw Material