IAC logo
IAC Assessment: OR0656
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0656
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2015
Principal Product Dairy Products
NAICS 311511 - Fluid Milk Manufacturing
SIC 2022 - Cheese, Natural And Processed
Sales >$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 339,010
Annual Production 10,000,000 Units
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,904,432 69,697,616 kWh $0.04
Electricity Demand $574,056 123,258 kW-months/year $4.66
Electricity Fees $18,600 - $ -
LPG $10 1 MMBtu $9.50
Other Energy $593,657 32,805 MMBtu $18.10
TOTAL ENERGY COSTS $4,090,755
RECOMMENDED SAVINGS* $2,839,866 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,522,480
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Other Energy Administrative Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand LPG Other Energy Administrative Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $ $ %
01: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$2,308,919
Cost:
$1,300,000
- - - - - - - - - - - - $2,308,919 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
$2,308,919
-
%
02: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$188,688
Cost:
$247,000
- - - - $188,688 21,581 - - - - - - - - -
-
kWh
-
-
kW-months/year
$188,688
21,581
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
%
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,591
Cost:
$27,789
$14,176 337,526 $2,202 468 - - - - $509 - $704 - - - $14,176
337,526
kWh
$2,202
468
kW-months/year
-
-
MMBtu
-
-
MMBtu
$509
-
$
$704
-
$
-
-
%
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$317,386
Cost:
-
$1,577,843 38,112,145 - - $(-1,882,768) (-168,537) $622,311 32,805 - - - - - - $1,577,843
38,112,145
kWh
-
-
kW-months/year
$(-1,882,768)
(-168,537)
MMBtu
$622,311
32,805
MMBtu
-
-
$
-
-
$
-
-
%
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,282
Cost:
$22,500
$6,314 150,334 $968 206 - - - - - - - - - - $6,314
150,334
kWh
$968
206
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$2,839,866
Cost:
$1,597,289
$1,598,333 38,600,005 $3,170 674 $(-1,694,080) (-146,956) $622,311 32,805 $509 - $704 - $2,308,919 - $1,598,333
38,600,005
kWh
$3,170
674
kW-months/year
$(-1,694,080)
(-146,956)
MMBtu
$622,311
32,805
MMBtu
$509
-
$
$704
-
$
$2,308,919
-
%
TOTAL IMPLEMENTED Savings:
$2,522,480
Cost:
$1,597,289
$20,490 487,860 $3,170 674 $188,688 21,581 - - $509 - $704 - $2,308,919 - $20,490
487,860
kWh
$3,170
674
kW-months/year
$188,688
21,581
MMBtu
-
-
MMBtu
$509
-
$
$704
-
$
$2,308,919
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $ $ %
Electricity Usage Electricity Demand LPG Other Energy Administrative Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand LPG Other Energy Administrative Changes Ancillary Material Cost Increase in Production