IAC logo
IAC Assessment: OR0659
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0659
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2015
Principal Product Seafood
NAICS 311710 - Seafood Product Preparation and Packaging
SIC 2077 - Animal And Marine Fats And Oils
Sales $100,000,000-$500,000,000
# of Employees 269
Plant Area (Sq.Ft.) 210,000
Annual Production 57,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $545,525 9,411,920 kWh $0.06
Electricity Demand $179,517 20,850 kW-months/year $8.61
Electricity Fees $66,824 - $ -
Natural Gas $108,535 29,043 MMBtu $3.74
TOTAL ENERGY COSTS $900,401
RECOMMENDED SAVINGS* $57,303 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,510
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Administrative Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,705
Cost:
$20,000
$8,485 137,254 $2,423 264 - - - - $726 - $(-929) - - - $8,485
137,254
kWh
$2,423
264
kW-months/year
-
-
MMBtu
-
-
gal
$726
-
$
$(-929)
-
$
-
-
Tgal
02: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT Savings:
$26,260
Cost:
$7,200
- - - - - - - - $(-3,740) - - - $30,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$(-3,740)
-
$
-
-
$
$30,000
-
Tgal
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$906
Cost:
$900
$906 14,663 - - - - - - - - - - - - $906
14,663
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
Tgal
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,192
Cost:
$8,000
$(-24) (-382) - - - - $6,216 1,040 - - - - - - $(-24)
(-382)
kWh
-
-
kW-months/year
-
-
MMBtu
$6,216
1,040
gal
-
-
$
-
-
$
-
-
Tgal
05: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$4,259
Cost:
$5,617
$655 10,595 - - $3,604 964 - - - - - - - - $655
10,595
kWh
-
-
kW-months/year
$3,604
964
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
Tgal
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,165
Cost:
$3,410
$6,165 99,723 - - - - - - - - - - - - $6,165
99,723
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
Tgal
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,353
Cost:
$8,000
- - - - $1,353 362 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,353
362
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
Tgal
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,463
Cost:
-
$1,154 18,669 $309 36 - - - - - - - - - - $1,154
18,669
kWh
$309
36
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$57,303
Cost:
$53,127
$17,341 280,522 $2,732 300 $4,957 1,326 $6,216 1,040 $(-3,014) - $(-929) - $30,000 - $17,341
280,522
kWh
$2,732
300
kW-months/year
$4,957
1,326
MMBtu
$6,216
1,040
gal
$(-3,014)
-
$
$(-929)
-
$
$30,000
-
Tgal
TOTAL IMPLEMENTED Savings:
$44,510
Cost:
$43,200
$8,461 136,872 $2,423 264 $1,353 362 $6,216 1,040 $(-3,014) - $(-929) - $30,000 - $8,461
136,872
kWh
$2,423
264
kW-months/year
$1,353
362
MMBtu
$6,216
1,040
gal
$(-3,014)
-
$
$(-929)
-
$
$30,000
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Administrative Changes Ancillary Material Cost Water Consumption