IAC logo
IAC Assessment: OR0665
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0665
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2016
Principal Product Stud Lumber
NAICS 321912 - Cut Stock, Resawing Lumber, and Planing
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 191
Plant Area (Sq.Ft.) 2,744,280
Annual Production 152,400,000 Units
Production Hrs. Annual 5,250
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,758,138 31,061,180 kWh $0.06
Electricity Demand $232,961 72,540 kW-months/year $3.21
Electricity Fees $131,530 - $ -
Other Energy $414,656 502,146 MMBtu $0.83
TOTAL ENERGY COSTS $2,537,285
RECOMMENDED SAVINGS* $124,049 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,478
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Wood Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$21,044
Cost:
$11,800
$21,044 357,708 - - - - - - - - $21,044
357,708
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.2127 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM Savings:
$88,324
Cost:
$19,650
- - - - $88,324 53,530 - - - - -
-
kWh
-
-
kW-months/year
$88,324
53,530
MMBtu
-
-
$
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$3,107
Cost:
$1,025
$3,107 52,813 - - - - - - - - $3,107
52,813
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,140
Cost:
$7,325
$6,165 104,788 $623 188 - - $216 - $1,136 - $6,165
104,788
kWh
$623
188
kW-months/year
-
-
MMBtu
$216
-
$
$1,136
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,434
Cost:
-
$3,043 51,726 $391 118 - - - - - - $3,043
51,726
kWh
$391
118
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$124,049
Cost:
$39,800
$33,359 567,035 $1,014 306 $88,324 53,530 $216 - $1,136 - $33,359
567,035
kWh
$1,014
306
kW-months/year
$88,324
53,530
MMBtu
$216
-
$
$1,136
-
$
TOTAL IMPLEMENTED Savings:
$24,478
Cost:
$11,800
$24,087 409,434 $391 118 - - - - - - $24,087
409,434
kWh
$391
118
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Wood Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Wood Personnel Changes Ancillary Material Cost