Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2017 |
Principal Product | Aluminum Extrusions |
NAICS | 331318 - Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3354 - Aluminum Extruded Products |
Sales | $50,000,000-$100,000,000 |
# of Employees | 110 |
Plant Area (Sq.Ft.) | 143,000 |
Annual Production | 26,000,000 Units |
Production Hrs. Annual | 6,240 |
Location (State) | WA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $336,057 | 6,616,050 | kWh | $0.05 |
Electricity Demand | $91,933 | 15,477 | kW-months/year | $5.94 |
Electricity Fees | $28,741 | - | $ | - |
Natural Gas | $93,553 | 17,248 | MMBtu | $5.42 |
TOTAL ENERGY COSTS | $550,284 | |||
RECOMMENDED SAVINGS* | $61,830 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $23,938 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM |
Savings: $19,831 Cost: $19,940 |
- | - | - | - | $19,831 | 4,813 | - | - | - | - |
- - kWh |
- - kW-months/year |
$19,831 4,813 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $16,054 Cost: $2,000 |
$16,054 | 345,627 | - | - | - | - | - | - | - | - |
$16,054 345,627 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM |
Savings: $4,107 Cost: $670 |
- | - | - | - | $4,107 | 997 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,107 997 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $7,828 Cost: $17,274 |
$7,828 | 168,527 | - | - | - | - | - | - | - | - |
$7,828 168,527 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $9,688 Cost: $32,940 |
$9,548 | 205,546 | $2,348 | 395 | - | - | $266 | - | $(-2,474) | - |
$9,548 205,546 kWh |
$2,348 395 kW-months/year |
- - MMBtu |
$266 - $ |
$(-2,474) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $2,456 Cost: $10,125 |
$2,079 | 44,768 | $376 | 63 | - | - | - | - | - | - |
$2,079 44,768 kWh |
$376 63 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM |
Savings: $1,866 Cost: $5,700 |
- | - | - | - | $1,866 | 453 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,866 453 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $61,830 Cost: $88,649 |
$35,509 | 764,468 | $2,724 | 458 | $25,804 | 6,263 | $266 | - | $(-2,474) | - | $35,509 764,468 kWh |
$2,724 458 kW-months/year |
$25,804 6,263 MMBtu |
$266 - $ |
$(-2,474) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $23,938 Cost: $20,610 |
- | - | - | - | $23,938 | 5,810 | - | - | - | - | - - kWh |
- - kW-months/year |
$23,938 5,810 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |