IAC logo
IAC Assessment: OR0685
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0685
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2017
Principal Product Asphalt, MDO
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $10,000,000-$50,000,000
# of Employees 15
Plant Area (Sq.Ft.) 1,742,000
Annual Production 6,859,211 BBL
Production Hrs. Annual 8,760
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $256,549 3,826,800 kWh $0.07
Electricity Demand $34,151 9,189 kW-months/year $3.72
Electricity Fees $135 - $ -
Natural Gas $1,092,155 254,076 MMBtu $4.30
TOTAL ENERGY COSTS $1,382,990
RECOMMENDED SAVINGS* $562,031 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$380,108
Cost:
$83,637
- - - - $299,644 65,424 $80,464 - - - -
-
kWh
-
-
kW-months/year
$299,644
65,424
MMBtu
$80,464
-
$
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$90,626
Cost:
$10,470
- - - - $90,626 19,787 - - - - -
-
kWh
-
-
kW-months/year
$90,626
19,787
MMBtu
-
-
$
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$27,005
Cost:
$27,335
$23,280 342,902 $3,725 839 - - - - - - $23,280
342,902
kWh
$3,725
839
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$59,155
Cost:
$90,400
$5,472 80,597 - - $53,683 11,721 - - - - $5,472
80,597
kWh
-
-
kW-months/year
$53,683
11,721
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,442
Cost:
$2,012
$378 5,292 $31 7 - - - - $2,033 - $378
5,292
kWh
$31
7
kW-months/year
-
-
MMBtu
-
-
$
$2,033
-
$
06: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$2,695
Cost:
$10,499
$2,695 39,695 - - - - - - - - $2,695
39,695
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$562,031
Cost:
$224,353
$31,825 468,486 $3,756 846 $443,953 96,932 $80,464 - $2,033 - $31,825
468,486
kWh
$3,756
846
kW-months/year
$443,953
96,932
MMBtu
$80,464
-
$
$2,033
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Primary Raw Material Ancillary Material Cost