IAC logo
IAC Assessment: OR0703
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0703
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2018
Principal Product Asphalt Shingles
NAICS 324122 - Asphalt Shingle and Coating Materials Manufacturing
SIC 2952 - Asphalt Felts And Coatings
Sales $100,000,000-$500,000,000
# of Employees 78
Plant Area (Sq.Ft.) 174,240
Annual Production 1,245,000 Units
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $258,338 4,416,386 kWh $0.06
Electricity Demand $55,491 9,750 kW-months/year $5.69
Electricity Fees $24,076 - $ -
Natural Gas $204,466 43,084 MMBtu $4.75
TOTAL ENERGY COSTS $542,371
RECOMMENDED SAVINGS* $32,087 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,277
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$8,902
Cost:
$12,504
- - - - $8,902 1,961 - - - - -
-
kWh
-
-
kW-months/year
$8,902
1,961
MMBtu
-
-
$
-
-
$
02: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$7,797
Cost:
$13,333
$2,645 45,231 $5,152 942 - - - - - - $2,645
45,231
kWh
$5,152
942
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,525
Cost:
$8,125
$6,678 113,006 $847 153 - - - - - - $6,678
113,006
kWh
$847
153
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,908
Cost:
$12,825
$6,112 104,475 - - $(-2,204) (-485) - - - - $6,112
104,475
kWh
-
-
kW-months/year
$(-2,204)
(-485)
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,955
Cost:
$4,730
$2,986 51,045 $560 102 - - $456 - $(-47) - $2,986
51,045
kWh
$560
102
kW-months/year
-
-
MMBtu
$456
-
$
$(-47)
-
$
TOTAL RECOMMENDED Savings:
$32,087
Cost:
$51,517
$18,421 313,757 $6,559 1,197 $6,698 1,476 $456 - $(-47) - $18,421
313,757
kWh
$6,559
1,197
kW-months/year
$6,698
1,476
MMBtu
$456
-
$
$(-47)
-
$
TOTAL IMPLEMENTED Savings:
$19,277
Cost:
$26,188
$12,309 209,282 $6,559 1,197 - - $456 - $(-47) - $12,309
209,282
kWh
$6,559
1,197
kW-months/year
-
-
MMBtu
$456
-
$
$(-47)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost