IAC logo
IAC Assessment: OR0740
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0740
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2021
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 13
Plant Area (Sq.Ft.) 921,270
Annual Production 1,000,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $244,496 4,322,411 kWh $0.06
Electricity Demand $42,369 15,017 kW-months/year $2.82
Electricity Fees $41,840 - $ -
Natural Gas $35,870 5,550 MMBtu $6.46
TOTAL ENERGY COSTS $364,575
RECOMMENDED SAVINGS* $284,345 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $216,029
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$69,219
Cost:
$8,189
$69,219 1,092,155 - - - - $69,219
1,092,155
kWh
-
-
kW-months/year
-
-
$
02: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$68,316
Cost:
$149,022
$61,424 969,440 $6,892 1,328 - - $61,424
969,440
kWh
$6,892
1,328
kW-months/year
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$54,988
Cost:
$79,709
$42,558 671,677 $12,430 2,395 - - $42,558
671,677
kWh
$12,430
2,395
kW-months/year
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$39,964
Cost:
$60,439
$37,031 584,449 $2,933 565 - - $37,031
584,449
kWh
$2,933
565
kW-months/year
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$27,831
Cost:
$84,560
$27,831 439,252 - - - - $27,831
439,252
kWh
-
-
kW-months/year
-
-
$
06: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$14,480
Cost:
$12,929
$14,480 228,535 - - - - $14,480
228,535
kWh
-
-
kW-months/year
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,547
Cost:
$3,289
$6,012 94,888 $1,023 197 $2,512 - $6,012
94,888
kWh
$1,023
197
kW-months/year
$2,512
-
$
TOTAL RECOMMENDED Savings:
$284,345
Cost:
$398,137
$258,555 4,080,396 $23,278 4,485 $2,512 - $258,555
4,080,396
kWh
$23,278
4,485
kW-months/year
$2,512
-
$
TOTAL IMPLEMENTED Savings:
$216,029
Cost:
$249,115
$197,131 3,110,956 $16,386 3,157 $2,512 - $197,131
3,110,956
kWh
$16,386
3,157
kW-months/year
$2,512
-
$
Savings
Cost
$ kWh $ kW-months/year $ $