IAC Assessment: OR0741
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0741
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2021
Principal Product Semiconductor Products and Contract Manufacturing
NAICS 334413 - Semiconductor and Related Device Manufacturing
SIC 3674 - Semiconductors And Related Devices
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 170,000
Annual Production 20,000 Units
Production Hrs. Annual 2,800
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $182,254 3,122,138 kWh $0.06
Electricity Demand $46,933 7,097 kW-months/year $6.61
Electricity Fees $63,157 - $ -
Natural Gas $30,875 3,442 MMBtu $8.97
TOTAL ENERGY COSTS $367,879
RECOMMENDED SAVINGS* $98,069 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,176
Cost:
$40,448
$11,499 159,861 $3,962 519 - - - - $1,150 - $(-435) - $11,499
159,861
kWh
$3,962
519
kW-months/year
-
-
MMBtu
-
-
lb
$1,150
-
$
$(-435)
-
$
02: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$56,371
Cost:
-
- - - - - - $56,371 812,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$56,371
812,000
lb
-
-
$
-
-
$
03: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$25,522
Cost:
$19,860
$18,301 254,430 $16,502 2,160 $(-9,281) (-1,035) - - - - - - $18,301
254,430
kWh
$16,502
2,160
kW-months/year
$(-9,281)
(-1,035)
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$98,069
Cost:
$60,308
$29,800 414,291 $20,464 2,679 $(-9,281) (-1,035) $56,371 812,000 $1,150 - $(-435) - $29,800
414,291
kWh
$20,464
2,679
kW-months/year
$(-9,281)
(-1,035)
MMBtu
$56,371
812,000
lb
$1,150
-
$
$(-435)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost