IAC Assessment: OR0772
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2023
Principal Product Formaldehyde Resins
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $50,000,000-$100,000,000
# of Employees 27
Plant Area (Sq.Ft.) 300,000
Annual Production 78,736 Tons
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $480,614 9,684,680 kWh $0.05
Electricity Demand $107,841 18,124 kW-months/year $5.95
Electricity Fees $22,047 - $ -
Natural Gas $455,134 46,380 MMBtu $9.81
TOTAL ENERGY COSTS $1,065,636
RECOMMENDED SAVINGS* $48,034 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,566
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$22,304
Cost:
$25,167
$19,906 373,256 $2,398 511 - - - - - - $19,906
373,256
kWh
$2,398
511
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$9,363
Cost:
$1,352
$8,354 156,645 $1,009 215 - - - - - - $8,354
156,645
kWh
$1,009
215
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,514
Cost:
$8,385
$4,077 76,552 $997 213 - - $823 - $1,617 - $4,077
76,552
kWh
$997
213
kW-months/year
-
-
$
$823
-
$
$1,617
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,801
Cost:
$7,178
- - - - $5,801 - - - - - -
-
kWh
-
-
kW-months/year
$5,801
-
$
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,740
Cost:
$3,039
$1,740 32,630 - - - - - - - - $1,740
32,630
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,312
Cost:
$5,390
$72 1,359 - - - - $1,240 - - - $72
1,359
kWh
-
-
kW-months/year
-
-
$
$1,240
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$48,034
Cost:
$50,511
$34,149 640,442 $4,404 939 $5,801 - $2,063 - $1,617 - $34,149
640,442
kWh
$4,404
939
kW-months/year
$5,801
-
$
$2,063
-
$
$1,617
-
$
TOTAL IMPLEMENTED Savings:
$10,566
Cost:
$16,814
$5,889 110,541 $997 213 - - $2,063 - $1,617 - $5,889
110,541
kWh
$997
213
kW-months/year
-
-
$
$2,063
-
$
$1,617
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes One-time Revenue or Avoided Cost