IAC logo
IAC Assessment: ORS003
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ORS003
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1999
Principal Product Seafood products
NAICS n/a
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $10,000,000-$50,000,000
# of Employees 226
Plant Area (Sq.Ft.) 65,000
Annual Production 14,500,000 Pounds
Production Hrs. Annual 4,680
Location (State) AK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $496,165 3,828,546 kWh $0.13
Electricity Demand $83,421 176,556 kW-months/year $0.47
Electricity Fees $2,880 - $ -
LPG $18,344 597 MMBtu $30.73
Fuel Oil #2 $94,417 16,407 MMBtu $5.75
TOTAL ENERGY COSTS $1,214,601
RECOMMENDED SAVINGS* $544,609 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $170,549
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees LPG Fuel Oil #2 Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees LPG Fuel Oil #2 Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ lb $ $ $ $
01: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST Savings:
$366,525
Cost:
$729,500
$496,165 3,828,546 $83,421 176,556 $2,880 - - - $(-215,941) (-37,323) - - - - - - $496,165
3,828,546
kWh
$83,421
176,556
kW-months/year
$2,880
-
$
-
-
MMBtu
$(-215,941)
(-37,323)
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,492
Cost:
$7,459
$8,233 63,599 $1,259 222 - - - - - - - - - - - - $8,233
63,599
kWh
$1,259
222
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$39,677
Cost:
$20,000
$39,677 306,272 - - - - - - - - - - - - - - $39,677
306,272
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,755
Cost:
$20,400
$7,755 59,789 - - - - - - - - - - - - - - $7,755
59,789
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,140
Cost:
$700
- - - - - - - - $2,140 372 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$2,140
372
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$1,420
Cost:
$2,000
- - - - - - - - $1,420 247 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,420
247
MMBtu
-
-
lb
-
-
$
-
-
$
07: 3.4151 MINIMIZE WATER USAGE Savings:
$(-1,640)
Cost:
$4,000
$(-1,640) (-12,603) - - - - - - - - - - - - - - $(-1,640)
(-12,603)
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 3.3133 USE OTHER WASTE CONCENTRATION METHODS Savings:
$39,020
Cost:
$34,600
$(-6,850) (-53,048) - - - - - - - - $49,300 3,280,000 $(-930) - $(-2,500) - $(-6,850)
(-53,048)
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
$49,300
3,280,000
lb
$(-930)
-
$
$(-2,500)
-
$
09: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$80,220
Cost:
$15,400
$(-480) (-3,810) - - - - $3,100 107 - - - - $77,600 - - - $(-480)
(-3,810)
kWh
-
-
kW-months/year
-
-
$
$3,100
107
MMBtu
-
-
MMBtu
-
-
lb
$77,600
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$544,609
Cost:
$834,059
$542,860 4,188,745 $84,680 176,778 $2,880 - $3,100 107 $(-212,381) (-36,704) $49,300 3,280,000 $76,670 - $(-2,500) - $542,860
4,188,745
kWh
$84,680
176,778
kW-months/year
$2,880
-
$
$3,100
107
MMBtu
$(-212,381)
(-36,704)
MMBtu
$49,300
3,280,000
lb
$76,670
-
$
$(-2,500)
-
$
TOTAL IMPLEMENTED Savings:
$170,549
Cost:
$78,159
$40,580 313,013 $1,259 222 - - $3,100 107 $2,140 372 $49,300 3,280,000 $76,670 - $(-2,500) - $40,580
313,013
kWh
$1,259
222
kW-months/year
-
-
$
$3,100
107
MMBtu
$2,140
372
MMBtu
$49,300
3,280,000
lb
$76,670
-
$
$(-2,500)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees LPG Fuel Oil #2 Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees LPG Fuel Oil #2 Solid Waste (non-haz) Personnel Changes Ancillary Material Cost