Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 1999 |
Principal Product | Seafood products |
NAICS | n/a |
SIC | 2092 - Fresh Or Frozen Prepared Fish |
Sales | $10,000,000-$50,000,000 |
# of Employees | 226 |
Plant Area (Sq.Ft.) | 65,000 |
Annual Production | 14,500,000 Pounds |
Production Hrs. Annual | 4,680 |
Location (State) | AK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $496,165 | 3,828,546 | kWh | $0.13 |
Electricity Demand | $83,421 | 176,556 | kW-months/year | $0.47 |
Electricity Fees | $2,880 | - | $ | - |
LPG | $18,344 | 597 | MMBtu | $30.73 |
Fuel Oil #2 | $94,417 | 16,407 | MMBtu | $5.75 |
TOTAL ENERGY COSTS | $1,214,601 | |||
RECOMMENDED SAVINGS* | $544,609 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $170,549 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | LPG | Fuel Oil #2 | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | LPG | Fuel Oil #2 | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST |
Savings: $366,525 Cost: $729,500 |
$496,165 | 3,828,546 | $83,421 | 176,556 | $2,880 | - | - | - | $(-215,941) | (-37,323) | - | - | - | - | - | - |
$496,165 3,828,546 kWh |
$83,421 176,556 kW-months/year |
$2,880 - $ |
- - MMBtu |
$(-215,941) (-37,323) MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $9,492 Cost: $7,459 |
$8,233 | 63,599 | $1,259 | 222 | - | - | - | - | - | - | - | - | - | - | - | - |
$8,233 63,599 kWh |
$1,259 222 kW-months/year |
- - $ |
- - MMBtu |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $39,677 Cost: $20,000 |
$39,677 | 306,272 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$39,677 306,272 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $7,755 Cost: $20,400 |
$7,755 | 59,789 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$7,755 59,789 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $2,140 Cost: $700 |
- | - | - | - | - | - | - | - | $2,140 | 372 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$2,140 372 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $1,420 Cost: $2,000 |
- | - | - | - | - | - | - | - | $1,420 | 247 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$1,420 247 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4151 MINIMIZE WATER USAGE |
Savings: $(-1,640) Cost: $4,000 |
$(-1,640) | (-12,603) | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$(-1,640) (-12,603) kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.3133 USE OTHER WASTE CONCENTRATION METHODS |
Savings: $39,020 Cost: $34,600 |
$(-6,850) | (-53,048) | - | - | - | - | - | - | - | - | $49,300 | 3,280,000 | $(-930) | - | $(-2,500) | - |
$(-6,850) (-53,048) kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - MMBtu |
$49,300 3,280,000 lb |
$(-930) - $ |
$(-2,500) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $80,220 Cost: $15,400 |
$(-480) | (-3,810) | - | - | - | - | $3,100 | 107 | - | - | - | - | $77,600 | - | - | - |
$(-480) (-3,810) kWh |
- - kW-months/year |
- - $ |
$3,100 107 MMBtu |
- - MMBtu |
- - lb |
$77,600 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $544,609 Cost: $834,059 |
$542,860 | 4,188,745 | $84,680 | 176,778 | $2,880 | - | $3,100 | 107 | $(-212,381) | (-36,704) | $49,300 | 3,280,000 | $76,670 | - | $(-2,500) | - | $542,860 4,188,745 kWh |
$84,680 176,778 kW-months/year |
$2,880 - $ |
$3,100 107 MMBtu |
$(-212,381) (-36,704) MMBtu |
$49,300 3,280,000 lb |
$76,670 - $ |
$(-2,500) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $170,549 Cost: $78,159 |
$40,580 | 313,013 | $1,259 | 222 | - | - | $3,100 | 107 | $2,140 | 372 | $49,300 | 3,280,000 | $76,670 | - | $(-2,500) | - | $40,580 313,013 kWh |
$1,259 222 kW-months/year |
- - $ |
$3,100 107 MMBtu |
$2,140 372 MMBtu |
$49,300 3,280,000 lb |
$76,670 - $ |
$(-2,500) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | LPG | Fuel Oil #2 | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | LPG | Fuel Oil #2 | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost |