IAC Assessment: RU0058
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0058
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1989
Principal Product PLASTIC LIDS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 104
Plant Area (Sq.Ft.) 0
Annual Production 550,000 Pieces
Production Hrs. Annual 6,864
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $520,999 7,116,061 kWh $0.07
Natural Gas $18,575 3,783 MMBtu $4.91
TOTAL ENERGY COSTS $539,574
RECOMMENDED SAVINGS* $43,643 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,613
Cost:
$446
$3,613 49,238 $3,613
49,238
kWh
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,807
Cost:
-
$2,807 38,394 $2,807
38,394
kWh
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$13,950
Cost:
$2,500
$13,950 - $13,950
-
kWh
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,672
Cost:
$594
$3,672 50,117 $3,672
50,117
kWh
05: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$2,996
Cost:
$7,200
$2,996 41,032 $2,996
41,032
kWh
06: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$16,605
Cost:
$11,500
$16,605 226,846 $16,605
226,846
kWh
TOTAL RECOMMENDED Savings:
$43,643
Cost:
$22,240
$43,643 405,627 $43,643
405,627
kWh
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage