IAC Assessment: RU0080
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0080
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1990
Principal Product FELT CARPET PADDING
NAICS n/a
SIC 2299 - Textile Goods, Nec
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 0
Annual Production 117,000 Thousand Feet
Production Hrs. Annual 3,760
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $585,765 7,021,981 kWh $0.08
Natural Gas $293,580 41,806 MMBtu $7.02
Fuel Oil #2 $4,073 630 MMBtu $6.47
TOTAL ENERGY COSTS $883,418
RECOMMENDED SAVINGS* $140,970 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,274
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,218
Cost:
$68
$2,218 26,671 - - - - $2,218
26,671
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,495
Cost:
-
$3,495 42,204 - - - - $3,495
42,204
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$2,478
Cost:
$800
$2,478 29,894 - - - - $2,478
29,894
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$602
Cost:
$86
$602 7,327 - - - - $602
7,327
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$6,426
Cost:
$3,026
$6,426 77,374 - - - - $6,426
77,374
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,454
Cost:
$6,245
$2,454 29,601 - - - - $2,454
29,601
kWh
-
-
MMBtu
-
-
MMBtu
07: 3.6122 INSTALL SOLID WASTE INCINERATOR FOR HEAT Savings:
$123,297
Cost:
$1,075,000
- - $119,224 16,983 $4,073 630 -
-
kWh
$119,224
16,983
MMBtu
$4,073
630
MMBtu
TOTAL RECOMMENDED Savings:
$140,970
Cost:
$1,085,225
$17,673 213,071 $119,224 16,983 $4,073 630 $17,673
213,071
kWh
$119,224
16,983
MMBtu
$4,073
630
MMBtu
TOTAL IMPLEMENTED Savings:
$5,274
Cost:
$6,399
$5,274 63,599 - - - - $5,274
63,599
kWh
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2