IAC Assessment: RU0093
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0093
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1990
Principal Product CONVEYERS & CHUTES
NAICS n/a
SIC 3559 - Special Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 0
Annual Production 1,250 Tons
Production Hrs. Annual 2,600
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,969 1,388,042 kWh $0.09
Fuel Oil #2 $27,092 4,620 MMBtu $5.86
TOTAL ENERGY COSTS $153,061
RECOMMENDED SAVINGS* $19,725 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,308
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,497
Cost:
$183
$1,497 16,413 - - - - $1,497
16,413
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$651
Cost:
-
$651 7,034 - - - - $651
7,034
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,109
Cost:
$1,900
$(-321) (-3,517) - - $4,430 756 $(-321)
(-3,517)
kWh
-
-
MMBtu
$4,430
756
MMBtu
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,811
Cost:
$2,500
$3,811 - - - - - $3,811
-
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$4,019
Cost:
-
$5,217 57,444 $(-1,198) (-245) - - $5,217
57,444
kWh
$(-1,198)
(-245)
MMBtu
-
-
MMBtu
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$227
Cost:
$550
- - - - $227 39 -
-
kWh
-
-
MMBtu
$227
39
MMBtu
07: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$5,411
Cost:
$1,920
- - - - $5,411 924 -
-
kWh
-
-
MMBtu
$5,411
924
MMBtu
TOTAL RECOMMENDED Savings:
$19,725
Cost:
$7,053
$10,855 77,374 $(-1,198) (-245) $10,068 1,719 $10,855
77,374
kWh
$(-1,198)
(-245)
MMBtu
$10,068
1,719
MMBtu
TOTAL IMPLEMENTED Savings:
$5,308
Cost:
$2,683
$5,308 16,413 - - - - $5,308
16,413
kWh
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2