IAC logo
IAC Assessment: RU0097
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0097
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1990
Principal Product VAPOR BARRIERS
NAICS n/a
SIC 2295 - Coated Fabrics, Not Rubberized
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 0
Annual Production 256 Thousand Feet
Production Hrs. Annual 6,120
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $126,450 1,422,919 kWh $0.09
Natural Gas $247,543 50,010 MMBtu $4.95
TOTAL ENERGY COSTS $373,993
RECOMMENDED SAVINGS* $51,455 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,777
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$631
Cost:
-
$631 7,034 - - $631
7,034
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,503
Cost:
$291
$1,503 16,999 - - $1,503
16,999
kWh
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,103
Cost:
$302
$1,103 12,309 - - $1,103
12,309
kWh
-
-
MMBtu
04: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$218
Cost:
$171
- - $218 44 -
-
kWh
$218
44
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,004
Cost:
-
$1,004 11,430 - - $1,004
11,430
kWh
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,450
Cost:
-
$2,450 27,550 - - $2,450
27,550
kWh
-
-
MMBtu
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,951
Cost:
$500
- - $4,951 1,000 -
-
kWh
$4,951
1,000
MMBtu
08: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$38,171
Cost:
$13,250
- - $38,171 7,711 -
-
kWh
$38,171
7,711
MMBtu
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,424
Cost:
$625
- - $1,424 303 -
-
kWh
$1,424
303
MMBtu
TOTAL RECOMMENDED Savings:
$51,455
Cost:
$15,139
$6,691 75,322 $44,764 9,058 $6,691
75,322
kWh
$44,764
9,058
MMBtu
TOTAL IMPLEMENTED Savings:
$10,777
Cost:
$1,598
$4,184 46,893 $6,593 1,347 $4,184
46,893
kWh
$6,593
1,347
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas