IAC logo
IAC Assessment: RU0108
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0108
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1991
Principal Product TEFLON LININGS FOR PIPES
NAICS n/a
SIC 3432 - Plumbing Fixture Fittings And Trim
Sales $10,000,000-$50,000,000
# of Employees 102
Plant Area (Sq.Ft.) 0
Annual Production 90,000 Pieces
Production Hrs. Annual 4,160
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $132,245 1,662,954 kWh $0.08
Natural Gas $21,689 4,079 MMBtu $5.32
TOTAL ENERGY COSTS $153,934
RECOMMENDED SAVINGS* $64,573 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $64,573
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$687
Cost:
$5,000
$687 8,792 - - $687
8,792
kWh
-
-
MMBtu
02: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$389
Cost:
$800
$389 4,982 - - $389
4,982
kWh
-
-
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$60,583
Cost:
$122,000
$81,704 1,027,843 $(-21,121) (-3,985) $81,704
1,027,843
kWh
$(-21,121)
(-3,985)
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,826
Cost:
$4,450
$1,826 22,860 - - $1,826
22,860
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$366
Cost:
$140
$366 4,982 - - $366
4,982
kWh
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$722
Cost:
$200
$722 9,086 - - $722
9,086
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$64,573
Cost:
$132,590
$85,694 1,078,545 $(-21,121) (-3,985) $85,694
1,078,545
kWh
$(-21,121)
(-3,985)
MMBtu
TOTAL IMPLEMENTED Savings:
$64,573
Cost:
$132,590
$85,694 1,078,545 $(-21,121) (-3,985) $85,694
1,078,545
kWh
$(-21,121)
(-3,985)
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas