IAC logo
IAC Assessment: RU0122
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0122
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1991
Principal Product FOLDED PAPER BOXES
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 0
Annual Production 200,000 Thousand Feet
Production Hrs. Annual 4,550
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,885 902,989 kWh $0.11
Natural Gas $47,159 7,981 MMBtu $5.91
TOTAL ENERGY COSTS $148,044
RECOMMENDED SAVINGS* $10,049 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,462
Cost:
-
$1,462 13,189 - - $1,462
13,189
kWh
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,447
Cost:
$272
$1,447 12,896 - - $1,447
12,896
kWh
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,176
Cost:
$30
$3,176 28,429 - - $3,176
28,429
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,355
Cost:
$326
$2,355 21,102 - - $2,355
21,102
kWh
-
-
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$728
Cost:
$5,243
$728 6,448 - - $728
6,448
kWh
-
-
MMBtu
06: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$645
Cost:
$90
$345 3,224 $300 43 $345
3,224
kWh
$300
43
MMBtu
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$236
Cost:
$500
- - $236 40 -
-
kWh
$236
40
MMBtu
TOTAL RECOMMENDED Savings:
$10,049
Cost:
$6,461
$9,513 85,288 $536 83 $9,513
85,288
kWh
$536
83
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas