Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Rutgers, State Univ. of NJ |
---|---|
Assessment Year | 1992 |
Principal Product | COMMERCIAL FOLDING BOXES |
NAICS | n/a |
SIC | 2657 - Folding Paperboard Boxes |
Sales | $10,000,000-$50,000,000 |
# of Employees | 137 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 250,000,000 Pieces |
Production Hrs. Annual | 7,200 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $182,715 | 1,981,536 | kWh | $0.09 |
Natural Gas | $46,022 | 8,237 | MMBtu | $5.59 |
TOTAL ENERGY COSTS | $228,737 | |||
RECOMMENDED SAVINGS* | $40,592 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $40,592 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED |
Savings: $10,985 Cost: $201 |
$10,985 | 119,285 | - | - | - | - |
$10,985 119,285 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,401 Cost: $68 |
$1,401 | 15,240 | - | - | - | - |
$1,401 15,240 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,050 Cost: $2,523 |
$3,416 | 37,222 | - | - | $(-366) | - |
$3,416 37,222 kWh |
- - MMBtu |
$(-366) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $10,165 Cost: $2,500 |
$10,165 | - | - | - | - | - |
$10,165 - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $921 Cost: $500 |
- | - | $921 | 165 | - | - |
- - kWh |
$921 165 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS |
Savings: $14,070 Cost: - |
- | - | $14,070 | 2,518 | - | - |
- - kWh |
$14,070 2,518 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $40,592 Cost: $5,792 |
$25,967 | 171,747 | $14,991 | 2,683 | $(-366) | - | $25,967 171,747 kWh |
$14,991 2,683 MMBtu |
$(-366) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $40,592 Cost: $5,792 |
$25,967 | 171,747 | $14,991 | 2,683 | $(-366) | - | $25,967 171,747 kWh |
$14,991 2,683 MMBtu |
$(-366) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |