IAC logo
IAC Assessment: RU0159
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0159
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1992
Principal Product UPHOLSTERY, FABRIC
NAICS n/a
SIC 2221 - Broadwoven Fabric Mills, Manmade
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 21,000 Thousand Feet
Production Hrs. Annual 8,568
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $448,714 6,505,276 kWh $0.07
Natural Gas $38,320 6,447 MMBtu $5.94
Fuel Oil #2 $54,466 10,994 MMBtu $4.95
TOTAL ENERGY COSTS $541,500
RECOMMENDED SAVINGS* $69,989 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,985
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,157
Cost:
$567
$5,157 74,736 - - - - - - $5,157
74,736
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$25,827
Cost:
$1,646
$27,485 398,300 - - - - $(-1,658) - $27,485
398,300
kWh
-
-
MMBtu
-
-
MMBtu
$(-1,658)
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,828
Cost:
-
$2,828 41,032 - - - - - - $2,828
41,032
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$3,526
Cost:
$409
- - $1,321 222 $2,205 445 - - -
-
kWh
$1,321
222
MMBtu
$2,205
445
MMBtu
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$8,390
Cost:
$11,500
- - $3,143 529 $5,247 1,058 - - -
-
kWh
$3,143
529
MMBtu
$5,247
1,058
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,117
Cost:
$322
- - $1,222 206 $1,895 382 - - -
-
kWh
$1,222
206
MMBtu
$1,895
382
MMBtu
-
-
$
07: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$21,144
Cost:
$10,000
$21,144 306,565 - - - - - - $21,144
306,565
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$69,989
Cost:
$24,444
$56,614 820,633 $5,686 957 $9,347 1,885 $(-1,658) - $56,614
820,633
kWh
$5,686
957
MMBtu
$9,347
1,885
MMBtu
$(-1,658)
-
$
TOTAL IMPLEMENTED Savings:
$7,985
Cost:
$567
$7,985 115,768 - - - - - - $7,985
115,768
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes