IAC Assessment: RU0161
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0161
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1992
Principal Product FANS,BLOWERS FOR ELECTRIC MOTORS
NAICS n/a
SIC 3564 - Blowers And Fans
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 0
Annual Production 60,000 Pieces
Production Hrs. Annual 6,240
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $95,169 975,088 kWh $0.10
Natural Gas $23,779 4,608 MMBtu $5.16
TOTAL ENERGY COSTS $118,948
RECOMMENDED SAVINGS* $15,378 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,393
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$689
Cost:
$100
$689 7,034 - - - - $689
7,034
kWh
-
-
MMBtu
-
-
$
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,622
Cost:
$5,125
$1,622 16,706 - - - - $1,622
16,706
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,075
Cost:
$183
$1,258 12,896 - - $(-183) - $1,258
12,896
kWh
-
-
MMBtu
$(-183)
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,363
Cost:
-
$3,363 34,584 - - - - $3,363
34,584
kWh
-
-
MMBtu
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$157
Cost:
$60
- - $157 30 - - -
-
kWh
$157
30
MMBtu
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,472
Cost:
$2,500
$8,472 - - - - - $8,472
-
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$15,378
Cost:
$7,968
$15,404 71,220 $157 30 $(-183) - $15,404
71,220
kWh
$157
30
MMBtu
$(-183)
-
$
TOTAL IMPLEMENTED Savings:
$10,393
Cost:
$2,843
$10,419 19,930 $157 30 $(-183) - $10,419
19,930
kWh
$157
30
MMBtu
$(-183)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes