IAC Assessment: RU0162
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0162
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1992
Principal Product AIR DRYERS
NAICS n/a
SIC 3613 - Switchgear And Switchboard Apparatus
Sales $5,000,000-$10,000,000
# of Employees 12
Plant Area (Sq.Ft.) 0
Annual Production 2,400 Pieces
Production Hrs. Annual 2,080
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $45,853 455,744 kWh $0.10
Natural Gas $17,859 3,105 MMBtu $5.75
TOTAL ENERGY COSTS $63,712
RECOMMENDED SAVINGS* $11,788 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,581
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$90
Cost:
$750
$90 879 - - - - $90
879
kWh
-
-
MMBtu
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$11
Cost:
$31
$11 293 - - - - $11
293
kWh
-
-
MMBtu
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,196
Cost:
$2,500
$2,196 - - - - - $2,196
-
kWh
-
-
MMBtu
-
-
$
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$477
Cost:
$1,080
$(-57) (-586) $534 93 - - $(-57)
(-586)
kWh
$534
93
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$104
Cost:
$24
$128 1,172 - - $(-24) - $128
1,172
kWh
-
-
MMBtu
$(-24)
-
$
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$8,910
Cost:
$10,500
- - $8,910 1,550 - - -
-
kWh
$8,910
1,550
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$11,788
Cost:
$14,885
$2,368 1,758 $9,444 1,643 $(-24) - $2,368
1,758
kWh
$9,444
1,643
MMBtu
$(-24)
-
$
TOTAL IMPLEMENTED Savings:
$9,581
Cost:
$12,354
$161 1,465 $9,444 1,643 $(-24) - $161
1,465
kWh
$9,444
1,643
MMBtu
$(-24)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes