IAC logo
IAC Assessment: SD0024
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0024
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1992
Principal Product INSTRUMENTS & RELATED PRODUCTS
NAICS n/a
SIC 3824 - Fluid Meters And Counting Devices
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 0
Annual Production 12,000 Pieces
Production Hrs. Annual 2,550
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $67,827 763,775 kWh $0.09
Natural Gas $11,046 1,708 MMBtu $6.47
TOTAL ENERGY COSTS $78,873
RECOMMENDED SAVINGS* $9,868 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,868
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,191
Cost:
$1,920
$1,191 13,482 - - $1,191
13,482
kWh
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$517
Cost:
$50
$517 5,862 - - $517
5,862
kWh
-
-
$
03: 2.7316 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN Savings:
$176
Cost:
-
$176 2,052 - - $176
2,052
kWh
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,581
Cost:
$3,000
$1,581 15,826 - - $1,581
15,826
kWh
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$358
Cost:
-
$480 5,275 $(-122) - $480
5,275
kWh
$(-122)
-
$
06: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$3,234
Cost:
$5,640
$2,990 33,411 $244 - $2,990
33,411
kWh
$244
-
$
07: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$2,811
Cost:
$9,000
$2,811 31,653 - - $2,811
31,653
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$9,868
Cost:
$19,610
$9,746 107,561 $122 - $9,746
107,561
kWh
$122
-
$
TOTAL IMPLEMENTED Savings:
$9,868
Cost:
$19,610
$9,746 107,561 $122 - $9,746
107,561
kWh
$122
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes