IAC logo
IAC Assessment: SD0034
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0034
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1992
Principal Product FIBERGLASS STORAGE TANKS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 0
Annual Production 1,600 Pieces
Production Hrs. Annual 4,862
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $163,234 1,820,047 kWh $0.09
Natural Gas $863 116 MMBtu $7.44
TOTAL ENERGY COSTS $164,097
RECOMMENDED SAVINGS* $39,581 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,055
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,905
Cost:
$8,000
$1,905 21,102 - - - - $1,905
21,102
kWh
-
-
MMBtu
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$18,199
Cost:
$250
$18,199 203,107 - - - - $18,199
203,107
kWh
-
-
MMBtu
-
-
$
03: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$1,661
Cost:
$325
- - $1,661 223 - - -
-
kWh
$1,661
223
MMBtu
-
-
$
04: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$34
Cost:
$13
- - $34 5 - - -
-
kWh
$34
5
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,951
Cost:
$1,197
$3,282 36,635 - - $(-331) - $3,282
36,635
kWh
-
-
MMBtu
$(-331)
-
$
06: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$3,582
Cost:
$6,400
$3,217 35,756 - - $365 - $3,217
35,756
kWh
-
-
MMBtu
$365
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,106
Cost:
$4,292
$814 9,086 - - $4,292 - $814
9,086
kWh
-
-
MMBtu
$4,292
-
$
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,143
Cost:
$700
$3,061 34,291 $3,082 414 - - $3,061
34,291
kWh
$3,082
414
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$39,581
Cost:
$21,177
$30,478 339,977 $4,777 642 $4,326 - $30,478
339,977
kWh
$4,777
642
MMBtu
$4,326
-
$
TOTAL IMPLEMENTED Savings:
$23,055
Cost:
$9,447
$23,386 260,844 - - $(-331) - $23,386
260,844
kWh
-
-
MMBtu
$(-331)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes