IAC logo
IAC Assessment: SD0035
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0035
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1992
Principal Product COMMUNICATION EQUIPMENT
NAICS n/a
SIC 3669 - Communications Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 139
Plant Area (Sq.Ft.) 0
Annual Production 200 Pieces
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $171,720 1,655,627 kWh $0.10
Natural Gas $128 11 MMBtu $11.64
TOTAL ENERGY COSTS $171,848
RECOMMENDED SAVINGS* $36,682 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$217
Cost:
$1,370
$217 2,052 - - $217
2,052
kWh
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,708
Cost:
$1,981
$5,168 49,824 $(-460) - $5,168
49,824
kWh
$(-460)
-
$
03: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$9,251
Cost:
$16,150
$8,219 79,132 $1,032 - $8,219
79,132
kWh
$1,032
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,966
Cost:
$2,240
$1,730 16,706 $236 - $1,730
16,706
kWh
$236
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$555
Cost:
$785
$331 3,224 $224 - $331
3,224
kWh
$224
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$19,144
Cost:
$400
$19,144 184,349 - - $19,144
184,349
kWh
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$598
Cost:
$20
$598 5,862 - - $598
5,862
kWh
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$243
Cost:
$188
$243 2,345 - - $243
2,345
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$36,682
Cost:
$23,134
$35,650 343,494 $1,032 - $35,650
343,494
kWh
$1,032
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes