IAC logo
IAC Assessment: SD0036
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0036
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1992
Principal Product PLASTIC INJECTION PARTS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 90
Plant Area (Sq.Ft.) 0
Annual Production 1,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $292,855 3,606,096 kWh $0.08
Natural Gas $569 60 MMBtu $9.48
TOTAL ENERGY COSTS $293,424
RECOMMENDED SAVINGS* $30,833 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,707
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$913
Cost:
$2,970
$913 11,137 - - $913
11,137
kWh
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$17,072
Cost:
$3,437
$17,072 210,141 - - $17,072
210,141
kWh
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,143
Cost:
$297
$6,143 75,615 - - $6,143
75,615
kWh
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$750
Cost:
$397
$750 9,379 - - $750
9,379
kWh
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$287
Cost:
$392
$357 4,396 $(-70) - $357
4,396
kWh
$(-70)
-
$
06: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$2,507
Cost:
$7,150
$2,155 26,377 $352 - $2,155
26,377
kWh
$352
-
$
07: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,480
Cost:
$1,520
$1,185 14,654 $295 - $1,185
14,654
kWh
$295
-
$
08: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,681
Cost:
$800
$1,526 18,757 $155 - $1,526
18,757
kWh
$155
-
$
TOTAL RECOMMENDED Savings:
$30,833
Cost:
$16,963
$30,101 370,456 $732 - $30,101
370,456
kWh
$732
-
$
TOTAL IMPLEMENTED Savings:
$3,707
Cost:
$10,512
$3,425 41,910 $282 - $3,425
41,910
kWh
$282
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes