IAC logo
IAC Assessment: SD0038
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0038
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1992
Principal Product AEROSPACE FASTENERS
NAICS n/a
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $10,000,000-$50,000,000
# of Employees 156
Plant Area (Sq.Ft.) 0
Annual Production 6,000 Pieces
Production Hrs. Annual 4,276
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $223,096 2,068,875 kWh $0.11
Natural Gas $9,227 1,377 MMBtu $6.70
TOTAL ENERGY COSTS $232,323
RECOMMENDED SAVINGS* $9,671 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,645
Cost:
$11,530
$1,645 15,240 - - $1,645
15,240
kWh
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$634
Cost:
$20
$634 5,862 - - $634
5,862
kWh
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,307
Cost:
$950
$1,541 14,361 $(-234) - $1,541
14,361
kWh
$(-234)
-
$
04: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$3,654
Cost:
$5,250
$3,262 30,188 $392 - $3,262
30,188
kWh
$392
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$750
Cost:
$909
$602 8,792 $148 - $602
8,792
kWh
$148
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,681
Cost:
$2,200
$543 4,982 $1,138 - $543
4,982
kWh
$1,138
-
$
TOTAL RECOMMENDED Savings:
$9,671
Cost:
$20,859
$8,227 79,425 $1,444 - $8,227
79,425
kWh
$1,444
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes