IAC logo
IAC Assessment: SD0046
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0046
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1993
Principal Product ENVIRON. MONITOR EQUIP.
NAICS n/a
SIC 3823 - Process Control Instruments
Sales $50,000,000-$100,000,000
# of Employees 140
Plant Area (Sq.Ft.) 0
Annual Production 150 Pieces
Production Hrs. Annual 4,250
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $105,346 959,848 kWh $0.11
TOTAL ENERGY COSTS $105,346
RECOMMENDED SAVINGS* $21,222 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$40
Cost:
$98
$40 293 - - $40
293
kWh
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$418
Cost:
$60
$418 3,810 - - $418
3,810
kWh
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$10,111
Cost:
$600
$10,111 92,028 - - $10,111
92,028
kWh
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,768
Cost:
-
$1,944 17,585 $(-176) - $1,944
17,585
kWh
$(-176)
-
$
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$6,470
Cost:
$5,480
$5,847 53,341 $623 - $5,847
53,341
kWh
$623
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,223
Cost:
$2,680
$1,069 8,499 $154 - $1,069
8,499
kWh
$154
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$719
Cost:
$3,300
$719 6,448 - - $719
6,448
kWh
-
-
$
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$473
Cost:
$115
$363 3,224 $110 - $363
3,224
kWh
$110
-
$
TOTAL RECOMMENDED Savings:
$21,222
Cost:
$12,333
$20,511 185,228 $711 - $20,511
185,228
kWh
$711
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $