IAC Assessment: SD0048
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0048
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1993
Principal Product COMPOSITE MATERIALS
NAICS n/a
SIC 3083 - Laminated Plastics Plate & Sheet
Sales $10,000,000-$50,000,000
# of Employees 175
Plant Area (Sq.Ft.) 0
Annual Production 3,000 Thousand Feet
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $415,315 4,206,624 kWh $0.10
Natural Gas $261,331 51,825 MMBtu $5.04
TOTAL ENERGY COSTS $676,646
RECOMMENDED SAVINGS* $115,057 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,426
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,294
Cost:
$1,103
$1,294 13,189 - - $1,294
13,189
kWh
-
-
$
02: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$82,299
Cost:
$143,700
$82,299 1,086,753 - - $82,299
1,086,753
kWh
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,491
Cost:
-
$2,711 27,550 $(-220) - $2,711
27,550
kWh
$(-220)
-
$
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$18,758
Cost:
$17,100
$16,041 162,368 $2,717 - $16,041
162,368
kWh
$2,717
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$4,596
Cost:
$5,840
$4,032 40,739 $564 - $4,032
40,739
kWh
$564
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$3,841
Cost:
$1,600
$3,453 34,877 $388 - $3,453
34,877
kWh
$388
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,778
Cost:
-
$2,300 23,447 $(-522) - $2,300
23,447
kWh
$(-522)
-
$
TOTAL RECOMMENDED Savings:
$115,057
Cost:
$169,343
$112,130 1,388,923 $2,927 - $112,130
1,388,923
kWh
$2,927
-
$
TOTAL IMPLEMENTED Savings:
$26,426
Cost:
$24,043
$23,667 239,743 $2,759 - $23,667
239,743
kWh
$2,759
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes