IAC Assessment: SD0050
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0050
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1993
Principal Product ADHESIVE COMPOSIT MATRL
NAICS n/a
SIC 2821 - Plastics Materials And Resins
Sales $10,000,000-$50,000,000
# of Employees 260
Plant Area (Sq.Ft.) 0
Annual Production 1,600,000 Pounds
Production Hrs. Annual 8,736
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,128,919 14,111,958 kWh $0.08
Natural Gas $125,304 23,627 MMBtu $5.30
TOTAL ENERGY COSTS $1,254,223
RECOMMENDED SAVINGS* $33,245 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,852
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,856
Cost:
$2,993
$1,856 23,154 - - - - $1,856
23,154
kWh
-
-
MMBtu
-
-
$
02: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$178
Cost:
$214
- - $178 34 - - -
-
kWh
$178
34
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,464
Cost:
-
$1,642 20,516 - - $(-178) - $1,642
20,516
kWh
-
-
MMBtu
$(-178)
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$25,354
Cost:
$25,076
$35,339 441,676 $(-9,985) (-1,884) - - $35,339
441,676
kWh
$(-9,985)
(-1,884)
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,393
Cost:
$3,521
$4,393 54,807 - - - - $4,393
54,807
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$33,245
Cost:
$31,804
$43,230 540,153 $(-9,807) (-1,850) $(-178) - $43,230
540,153
kWh
$(-9,807)
(-1,850)
MMBtu
$(-178)
-
$
TOTAL IMPLEMENTED Savings:
$28,852
Cost:
$28,283
$38,837 485,346 $(-9,807) (-1,850) $(-178) - $38,837
485,346
kWh
$(-9,807)
(-1,850)
MMBtu
$(-178)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes