IAC Assessment: SD0052
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0052
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1993
Principal Product INDUSTRIAL LUBRICANTS
NAICS n/a
SIC 2992 - Lubricating Oils And Greases
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 0
Annual Production 5,500 Thousand Gallons
Production Hrs. Annual 2,125
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $170,173 1,353,458 kWh $0.13
Natural Gas $79,094 22,258 MMBtu $3.55
TOTAL ENERGY COSTS $249,267
RECOMMENDED SAVINGS* $37,390 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,594
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$165
Cost:
$222
$165 1,172 - - - - $165
1,172
kWh
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,255
Cost:
$4,329
$4,255 33,998 - - - - $4,255
33,998
kWh
-
-
MMBtu
-
-
$
03: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$312
Cost:
$658
- - $312 88 - - -
-
kWh
$312
88
MMBtu
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,571
Cost:
$654
- - $1,571 443 - - -
-
kWh
$1,571
443
MMBtu
-
-
$
05: 2.1242 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT Savings:
$9,280
Cost:
$2,450
- - $9,280 2,614 - - -
-
kWh
$9,280
2,614
MMBtu
-
-
$
06: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$14,542
Cost:
$6,550
- - $14,542 4,096 - - -
-
kWh
$14,542
4,096
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,035
Cost:
$40
$3,035 24,033 - - - - $3,035
24,033
kWh
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$434
Cost:
-
$485 3,810 - - $(-51) - $485
3,810
kWh
-
-
MMBtu
$(-51)
-
$
09: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$2,893
Cost:
$3,900
$2,563 20,516 - - $330 - $2,563
20,516
kWh
-
-
MMBtu
$330
-
$
10: 2.6232 INSTALL SET-BACK TIMERS Savings:
$903
Cost:
$1,240
$759 6,155 - - $144 - $759
6,155
kWh
-
-
MMBtu
$144
-
$
TOTAL RECOMMENDED Savings:
$37,390
Cost:
$20,043
$11,262 89,684 $25,705 7,241 $423 - $11,262
89,684
kWh
$25,705
7,241
MMBtu
$423
-
$
TOTAL IMPLEMENTED Savings:
$33,594
Cost:
$14,903
$7,940 63,013 $25,705 7,241 $(-51) - $7,940
63,013
kWh
$25,705
7,241
MMBtu
$(-51)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes