IAC logo
IAC Assessment: SD0053
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0053
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1993
Principal Product AIRCRAFT EXHAUST DUCTS
NAICS n/a
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 450
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 4,250
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,412,863 15,028,722 kWh $0.09
Natural Gas $19,407 3,096 MMBtu $6.27
TOTAL ENERGY COSTS $1,432,270
RECOMMENDED SAVINGS* $16,030 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,713
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,264
Cost:
$1,803
$1,264 13,482 - - $1,264
13,482
kWh
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,892
Cost:
$6,584
$2,892 30,774 - - $2,892
30,774
kWh
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,557
Cost:
$19,600
$7,557 80,305 - - $7,557
80,305
kWh
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,738
Cost:
$280
$1,738 18,464 - - $1,738
18,464
kWh
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,579
Cost:
$3,520
$757 8,206 $1,822 - $757
8,206
kWh
$1,822
-
$
TOTAL RECOMMENDED Savings:
$16,030
Cost:
$31,787
$14,208 151,231 $1,822 - $14,208
151,231
kWh
$1,822
-
$
TOTAL IMPLEMENTED Savings:
$11,713
Cost:
$27,987
$11,713 124,561 - - $11,713
124,561
kWh
-
-
$