IAC logo
IAC Assessment: SD0056
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0056
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1993
Principal Product PAPERBOARD CARTONS
NAICS n/a
SIC 2657 - Folding Paperboard Boxes
Sales $50,000,000-$100,000,000
# of Employees 360
Plant Area (Sq.Ft.) 0
Annual Production 384,000 Tons
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $595,435 7,061,548 kWh $0.08
Natural Gas $34,856 5,940 MMBtu $5.87
TOTAL ENERGY COSTS $630,291
RECOMMENDED SAVINGS* $19,230 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,106
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,009
Cost:
$978
$1,009 12,016 - - $1,009
12,016
kWh
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,029
Cost:
$300
$3,029 36,049 - - $3,029
36,049
kWh
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,097
Cost:
-
$4,392 52,169 $(-295) - $4,392
52,169
kWh
$(-295)
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,700
Cost:
$199
$1,127 13,482 $573 - $1,127
13,482
kWh
$573
-
$
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$6,987
Cost:
$20,500
$6,531 77,374 $456 - $6,531
77,374
kWh
$456
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,408
Cost:
$2,880
$2,007 23,740 $401 - $2,007
23,740
kWh
$401
-
$
TOTAL RECOMMENDED Savings:
$19,230
Cost:
$24,857
$18,095 214,830 $1,135 - $18,095
214,830
kWh
$1,135
-
$
TOTAL IMPLEMENTED Savings:
$5,106
Cost:
$978
$5,401 64,185 $(-295) - $5,401
64,185
kWh
$(-295)
-
$