IAC Assessment: SD0062
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0062
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1993
Principal Product WHOLESALE BEEF
NAICS n/a
SIC 2011 - Meat Packing Plants
Sales $1,000,000-$5,000,000
# of Employees 80
Plant Area (Sq.Ft.) 0
Annual Production 33,200 Pieces
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $143,436 1,892,732 kWh $0.08
Natural Gas $34,643 6,025 MMBtu $5.75
TOTAL ENERGY COSTS $178,079
RECOMMENDED SAVINGS* $17,510 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,891
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,044
Cost:
$950
$1,044 13,775 - - - - $1,044
13,775
kWh
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,350
Cost:
-
$2,350 31,067 - - - - $2,350
31,067
kWh
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$127
Cost:
$80
$127 1,758 - - - - $127
1,758
kWh
-
-
MMBtu
-
-
$
04: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$11,880
Cost:
$18,000
- - $11,880 2,066 - - -
-
kWh
$11,880
2,066
MMBtu
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$242
Cost:
$200
- - $242 42 - - -
-
kWh
$242
42
MMBtu
-
-
$
06: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$370
Cost:
$47
- - $370 64 - - -
-
kWh
$370
64
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,122
Cost:
-
$1,231 16,120 - - $(-109) - $1,231
16,120
kWh
-
-
MMBtu
$(-109)
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$375
Cost:
-
$368 4,103 - - $7 - $368
4,103
kWh
-
-
MMBtu
$7
-
$
TOTAL RECOMMENDED Savings:
$17,510
Cost:
$19,277
$5,120 66,823 $12,492 2,172 $(-102) - $5,120
66,823
kWh
$12,492
2,172
MMBtu
$(-102)
-
$
TOTAL IMPLEMENTED Savings:
$3,891
Cost:
$1,077
$3,521 46,600 $370 64 - - $3,521
46,600
kWh
$370
64
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes