IAC Assessment: SD0066
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0066
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1993
Principal Product ANODIZING AND PLATING
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 88
Plant Area (Sq.Ft.) 0
Annual Production 5,000,000 Pieces
Production Hrs. Annual 6,120
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,477 570,340 kWh $0.13
Natural Gas $59,871 15,097 MMBtu $3.97
TOTAL ENERGY COSTS $133,348
RECOMMENDED SAVINGS* $60,730 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,068
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Primary Raw Material Electricity Usage Natural Gas Administrative Changes Primary Raw Material
$ kWh $ MMBtu $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,693
Cost:
$507
$1,693 9,965 - - - - - - $1,693
9,965
kWh
-
-
MMBtu
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$7,934
Cost:
-
$7,934 46,014 - - - - - - $7,934
46,014
kWh
-
-
MMBtu
-
-
$
-
-
$
03: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$6,874
Cost:
$1,012
$6,874 39,859 - - - - - - $6,874
39,859
kWh
-
-
MMBtu
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,788
Cost:
$315
$2,788 16,120 - - - - - - $2,788
16,120
kWh
-
-
MMBtu
-
-
$
-
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$893
Cost:
$300
$893 5,275 - - - - - - $893
5,275
kWh
-
-
MMBtu
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$17,069
Cost:
$120
$17,069 99,062 - - - - - - $17,069
99,062
kWh
-
-
MMBtu
-
-
$
-
-
$
07: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$2,751
Cost:
$3,889
$(-1,229) (-7,034) $3,980 706 - - - - $(-1,229)
(-7,034)
kWh
$3,980
706
MMBtu
-
-
$
-
-
$
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$9,375
Cost:
$15,000
- - - - - - $9,375 - -
-
kWh
-
-
MMBtu
-
-
$
$9,375
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,598
Cost:
-
$5,756 33,411 - - $(-158) - - - $5,756
33,411
kWh
-
-
MMBtu
$(-158)
-
$
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$51
Cost:
$180
$51 293 - - - - - - $51
293
kWh
-
-
MMBtu
-
-
$
-
-
$
11: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$1,691
Cost:
$1,140
$1,590 9,086 - - $101 - - - $1,590
9,086
kWh
-
-
MMBtu
$101
-
$
-
-
$
12: 2.6232 INSTALL SET-BACK TIMERS Savings:
$376
Cost:
$600
$362 2,052 - - $14 - - - $362
2,052
kWh
-
-
MMBtu
$14
-
$
-
-
$
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$369
Cost:
-
$572 3,224 - - $(-203) - - - $572
3,224
kWh
-
-
MMBtu
$(-203)
-
$
-
-
$
14: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$1,774
Cost:
$916
$1,774 9,672 - - - - - - $1,774
9,672
kWh
-
-
MMBtu
-
-
$
-
-
$
15: 2.6232 INSTALL SET-BACK TIMERS Savings:
$328
Cost:
$25
$309 1,758 - - $19 - - - $309
1,758
kWh
-
-
MMBtu
$19
-
$
-
-
$
16: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,166
Cost:
$300
$758 4,396 $408 72 - - - - $758
4,396
kWh
$408
72
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$60,730
Cost:
$24,304
$47,194 273,153 $4,388 778 $(-227) - $9,375 - $47,194
273,153
kWh
$4,388
778
MMBtu
$(-227)
-
$
$9,375
-
$
TOTAL IMPLEMENTED Savings:
$51,068
Cost:
$22,977
$37,532 217,174 $4,388 778 $(-227) - $9,375 - $37,532
217,174
kWh
$4,388
778
MMBtu
$(-227)
-
$
$9,375
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Administrative Changes Primary Raw Material Electricity Usage Natural Gas Administrative Changes Primary Raw Material