IAC logo
IAC Assessment: SD0067
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0067
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1993
Principal Product PLASTIC PIPE PRODUCTS
NAICS n/a
SIC 3084 - Plastics Pipe
Sales $5,000,000-$10,000,000
# of Employees 30
Plant Area (Sq.Ft.) 0
Annual Production 18,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $225,817 3,330,012 kWh $0.07
TOTAL ENERGY COSTS $225,817
RECOMMENDED SAVINGS* $26,675 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,870
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,899
Cost:
$2,345
$1,899 28,136 - - $1,899
28,136
kWh
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,856
Cost:
$4,624
$3,856 56,858 - - $3,856
56,858
kWh
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,595
Cost:
$180
$6,595 97,304 - - $6,595
97,304
kWh
-
-
$
04: 2.7314 REDUCE VENTILATION AIR Savings:
$111
Cost:
$55
$111 1,758 - - $111
1,758
kWh
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$9,548
Cost:
$1,408
$9,548 140,680 - - $9,548
140,680
kWh
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$765
Cost:
$31
$765 11,430 - - $765
11,430
kWh
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,718
Cost:
$93
$1,834 26,964 $(-116) - $1,834
26,964
kWh
$(-116)
-
$
08: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$894
Cost:
$840
$776 11,430 $118 - $776
11,430
kWh
$118
-
$
09: 2.6232 INSTALL SET-BACK TIMERS Savings:
$596
Cost:
$720
$524 7,620 $72 - $524
7,620
kWh
$72
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$43
Cost:
-
$39 586 $4 - $39
586
kWh
$4
-
$
11: 2.6232 INSTALL SET-BACK TIMERS Savings:
$391
Cost:
$100
$330 4,982 $61 - $330
4,982
kWh
$61
-
$
12: 2.7134 USE PHOTOCELL CONTROLS Savings:
$219
Cost:
$115
$189 2,931 $30 - $189
2,931
kWh
$30
-
$
13: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$40
Cost:
$20
$40 586 - - $40
586
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$26,675
Cost:
$10,531
$26,506 391,265 $169 - $26,506
391,265
kWh
$169
-
$
TOTAL IMPLEMENTED Savings:
$25,870
Cost:
$10,480
$25,701 379,249 $169 - $25,701
379,249
kWh
$169
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes