IAC Assessment: SD0078
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0078
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1994
Principal Product Prescision Molded Rubber Seals
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 60
Plant Area (Sq.Ft.) 20,000
Annual Production 100,000,000 Pieces
Production Hrs. Annual 4,420
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,382 638,628 kWh $0.11
Natural Gas $465 180 MMBtu $2.58
TOTAL ENERGY COSTS $72,847
RECOMMENDED SAVINGS* $20,024 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,339
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,072
Cost:
$2,240
$1,072 9,379 $1,072
9,379
kWh
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,864
Cost:
$100
$5,864 51,876 $5,864
51,876
kWh
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,891
Cost:
$832
$1,891 16,706 $1,891
16,706
kWh
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$152
Cost:
$153
$152 1,465 $152
1,465
kWh
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,549
Cost:
$300
$1,549 13,775 $1,549
13,775
kWh
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,867
Cost:
$2,438
$2,867 24,912 $2,867
24,912
kWh
07: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$4,441
Cost:
$4,196
$4,441 36,635 $4,441
36,635
kWh
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$295
Cost:
$104
$295 2,052 $295
2,052
kWh
09: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$405
Cost:
$150
$405 3,224 $405
3,224
kWh
10: 2.7134 USE PHOTOCELL CONTROLS Savings:
$247
Cost:
$115
$247 2,052 $247
2,052
kWh
11: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,241
Cost:
$800
$1,241 10,258 $1,241
10,258
kWh
TOTAL RECOMMENDED Savings:
$20,024
Cost:
$11,428
$20,024 172,334 $20,024
172,334
kWh
TOTAL IMPLEMENTED Savings:
$11,339
Cost:
$5,682
$11,339 98,477 $11,339
98,477
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage