IAC Assessment: SD0107
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0107
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1995
Principal Product Metal Cans
NAICS n/a
SIC 3411 - Metal Cans
Sales $10,000,000-$50,000,000
# of Employees 134
Plant Area (Sq.Ft.) 420,000
Annual Production 42,000,000 Pounds
Production Hrs. Annual 4,160
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $705,292 7,170,575 kWh $0.10
Natural Gas $373,846 89,612 MMBtu $4.17
TOTAL ENERGY COSTS $1,083,138
RECOMMENDED SAVINGS* $199,252 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $172,749
#|Description Savings
Cost
Status Electricity Usage Water Disposal Administrative Changes Electricity Usage Water Disposal Administrative Changes
$ kWh $ Tgal $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,588
Cost:
$14,400
$8,588 87,339 - - - - $8,588
87,339
kWh
-
-
Tgal
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$94,795
Cost:
$22,000
- - - - $94,795 - -
-
kWh
-
-
Tgal
$94,795
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$9,603
Cost:
$4,100
$9,603 97,597 - - - - $9,603
97,597
kWh
-
-
Tgal
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$32,270
Cost:
$62,889
$32,270 325,029 - - - - $32,270
325,029
kWh
-
-
Tgal
-
-
$
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$25,421
Cost:
$23,285
$25,421 240,621 - - - - $25,421
240,621
kWh
-
-
Tgal
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,466
Cost:
$2,184
$2,466 23,154 - - - - $2,466
23,154
kWh
-
-
Tgal
-
-
$
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$9,209
Cost:
$1,260
$9,209 81,770 - - - - $9,209
81,770
kWh
-
-
Tgal
-
-
$
08: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$8,450
Cost:
$5,000
- - $8,450 3,840 - - -
-
kWh
$8,450
3,840
Tgal
-
-
$
09: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$8,450
Cost:
$4,885
- - $8,450 3,840 - - -
-
kWh
$8,450
3,840
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$199,252
Cost:
$140,003
$87,557 855,510 $16,900 7,680 $94,795 - $87,557
855,510
kWh
$16,900
7,680
Tgal
$94,795
-
$
TOTAL IMPLEMENTED Savings:
$172,749
Cost:
$126,018
$77,954 757,913 - - $94,795 - $77,954
757,913
kWh
-
-
Tgal
$94,795
-
$
Savings
Cost
$ kWh $ Tgal $ $
Electricity Usage Water Disposal Administrative Changes Electricity Usage Water Disposal Administrative Changes