Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 1995 |
Principal Product | Prepreg (B-Stage) & Copper Clad |
NAICS | n/a |
SIC | 3672 - Printed Circuit Boards |
Sales | $1,000,000-$5,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 40,000 |
Annual Production | 3,000,000 Thousand Feet |
Production Hrs. Annual | 5,460 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $45,932 | 467,468 | kWh | $0.10 |
Natural Gas | $152,247 | 35,711 | MMBtu | $4.26 |
TOTAL ENERGY COSTS | $198,179 | |||
RECOMMENDED SAVINGS* | $94,394 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $93,233 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,166 Cost: $1,030 |
$1,166 | 12,016 | - | - |
$1,166 12,016 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2423 INSTALL WASTE HEAT BOILER TO PRODUCE STEAM |
Savings: $77,121 Cost: $121,250 |
- | - | $77,121 | 18,127 |
- - kWh |
$77,121 18,127 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $2,871 Cost: $2,761 |
- | - | $2,871 | 674 |
- - kWh |
$2,871 674 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $809 Cost: $1,970 |
- | - | $809 | 190 |
- - kWh |
$809 190 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,430 Cost: $5,990 |
$4,430 | 45,135 | - | - |
$4,430 45,135 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $6,836 Cost: $3,940 |
$6,836 | 64,771 | - | - |
$6,836 64,771 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,161 Cost: $880 |
$1,161 | 11,137 | - | - |
$1,161 11,137 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $94,394 Cost: $137,821 |
$13,593 | 133,059 | $80,801 | 18,991 | $13,593 133,059 kWh |
$80,801 18,991 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $93,233 Cost: $136,941 |
$12,432 | 121,922 | $80,801 | 18,991 | $12,432 121,922 kWh |
$80,801 18,991 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |