Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1995
Principal Product Printed Circuit Boards
NAICS n/a
SIC 3672 - Printed Circuit Boards
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 35,000
Annual Production 35,000 Units
Production Hrs. Annual 11,440
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $267,247 2,273,154 kWh $0.12
Natural Gas $4,203 456 MMBtu $9.22
TOTAL ENERGY COSTS $271,450
RECOMMENDED SAVINGS* $45,710 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,939
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,089
Cost:
$5,020
$6,089 57,151 $6,089
57,151
kWh
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,109
Cost:
$15
$2,109 19,930 $2,109
19,930
kWh
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$662
Cost:
$300
$662 6,155 $662
6,155
kWh
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,277
Cost:
$20,545
$15,277 141,559 $15,277
141,559
kWh
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$20,454
Cost:
$12,500
$20,454 190,211 $20,454
190,211
kWh
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,119
Cost:
$484
$1,119 10,258 $1,119
10,258
kWh
TOTAL RECOMMENDED Savings:
$45,710
Cost:
$38,864
$45,710 425,264 $45,710
425,264
kWh
TOTAL IMPLEMENTED Savings:
$42,939
Cost:
$38,549
$42,939 399,179 $42,939
399,179
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage