Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1996
Principal Product Cast Aluminum Wheels For Autos and Light Trucks
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 120,000
Annual Production 240,000 Pounds
Production Hrs. Annual 12,375
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $152,190 3,061,841 kWh $0.05
Electricity Demand $114,337 8,389 kW-months/year $13.63
Natural Gas $184,068 57,214 MMBtu $3.22
TOTAL ENERGY COSTS $450,595
RECOMMENDED SAVINGS* $30,347 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,347
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,319
Cost:
$5,940
$4,319 53,634 - - - - $4,319
53,634
kWh
-
-
MMBtu
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,093
Cost:
$10,000
- - $4,093 1,279 - - -
-
kWh
$4,093
1,279
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$752
Cost:
$554
- - $752 235 - - -
-
kWh
$752
235
MMBtu
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$858
Cost:
$600
$858 13,189 - - - - $858
13,189
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,154
Cost:
$3,613
$2,154 23,447 - - - - $2,154
23,447
kWh
-
-
MMBtu
-
-
$
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$1,600
Cost:
$1,830
$1,600 15,240 - - - - $1,600
15,240
kWh
-
-
MMBtu
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$635
Cost:
$1,010
$635 5,275 - - - - $635
5,275
kWh
-
-
MMBtu
-
-
$
08: 3.1171 CHANGE PRODUCT SPECS Savings:
$15,936
Cost:
$5,000
- - - - $15,936 - -
-
kWh
-
-
MMBtu
$15,936
-
$
TOTAL RECOMMENDED Savings:
$30,347
Cost:
$28,547
$9,566 110,785 $4,845 1,514 $15,936 - $9,566
110,785
kWh
$4,845
1,514
MMBtu
$15,936
-
$
TOTAL IMPLEMENTED Savings:
$30,347
Cost:
$28,547
$9,566 110,785 $4,845 1,514 $15,936 - $9,566
110,785
kWh
$4,845
1,514
MMBtu
$15,936
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes