IAC logo
IAC Assessment: SD0143
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0143
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1996
Principal Product Chrome Plated Pipes
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 25
Plant Area (Sq.Ft.) 50,000
Annual Production 367,000,000 Pieces
Production Hrs. Annual 4,250
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $286,811 5,418,816 kWh $0.05
Electricity Demand $182,180 11,710 kW-months/year $15.56
Natural Gas $10,581 1,369 MMBtu $7.73
TOTAL ENERGY COSTS $497,634
RECOMMENDED SAVINGS* $35,367 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,367
#|Description Savings
Cost
Status Electricity Usage Water Disposal Other Liquid (haz) Electricity Usage Water Disposal Other Liquid (haz)
$ kWh $ Tgal $ gal
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,050
Cost:
$3,030
$4,050 49,531 - - - - $4,050
49,531
kWh
-
-
Tgal
-
-
gal
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$7,102
Cost:
$550
$7,102 98,183 - - - - $7,102
98,183
kWh
-
-
Tgal
-
-
gal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,180
Cost:
$4,458
$3,180 26,671 - - - - $3,180
26,671
kWh
-
-
Tgal
-
-
gal
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$2,099
Cost:
$2,480
$2,099 15,240 - - - - $2,099
15,240
kWh
-
-
Tgal
-
-
gal
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$874
Cost:
$410
$874 6,155 - - - - $874
6,155
kWh
-
-
Tgal
-
-
gal
06: 3.8136 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED Savings:
$16,297
Cost:
$1,450
- - - - $16,297 2,760 -
-
kWh
-
-
Tgal
$16,297
2,760
gal
07: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$1,000
Cost:
$280
- - $1,000 250,000 - - -
-
kWh
$1,000
250,000
Tgal
-
-
gal
08: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$765
Cost:
$200
- - $765 150,000 - - -
-
kWh
$765
150,000
Tgal
-
-
gal
TOTAL RECOMMENDED Savings:
$35,367
Cost:
$12,858
$17,305 195,780 $1,765 400,000 $16,297 2,760 $17,305
195,780
kWh
$1,765
400,000
Tgal
$16,297
2,760
gal
TOTAL IMPLEMENTED Savings:
$35,367
Cost:
$12,858
$17,305 195,780 $1,765 400,000 $16,297 2,760 $17,305
195,780
kWh
$1,765
400,000
Tgal
$16,297
2,760
gal
Savings
Cost
$ kWh $ Tgal $ gal
Electricity Usage Water Disposal Other Liquid (haz) Electricity Usage Water Disposal Other Liquid (haz)