IAC logo
IAC Assessment: SD0147
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0147
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1996
Principal Product Meat & Bone Meal., Yellow Grease, Tallow
NAICS n/a
SIC 2077 - Animal And Marine Fats And Oils
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 50,000
Annual Production 208,000,000 Pounds
Production Hrs. Annual 6,864
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $302,105 5,750,879 kWh $0.05
Electricity Demand $256,403 16,562 kW-months/year $15.48
Natural Gas $503,663 238,219 MMBtu $2.11
TOTAL ENERGY COSTS $1,063,671
RECOMMENDED SAVINGS* $70,619 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $70,619
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (haz) Administrative Changes
$ kWh $ MMBtu $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,156
Cost:
$15,120
$9,156 114,302 - - - - - - $9,156
114,302
kWh
-
-
MMBtu
-
-
lb
-
-
$
02: 2.1242 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT Savings:
$35,224
Cost:
$55,000
- - $35,224 16,773 - - - - -
-
kWh
$35,224
16,773
MMBtu
-
-
lb
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$779
Cost:
$1,700
- - $779 371 - - - - -
-
kWh
$779
371
MMBtu
-
-
lb
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,036
Cost:
$4,869
- - $2,036 969 - - - - -
-
kWh
$2,036
969
MMBtu
-
-
lb
-
-
$
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$819
Cost:
$300
- - $819 390 - - - - -
-
kWh
$819
390
MMBtu
-
-
lb
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,547
Cost:
$2,779
$1,547 16,120 - - - - - - $1,547
16,120
kWh
-
-
MMBtu
-
-
lb
-
-
$
07: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$4,917
Cost:
$4,005
$4,917 52,169 - - - - - - $4,917
52,169
kWh
-
-
MMBtu
-
-
lb
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,301
Cost:
$952
$1,301 12,603 - - - - - - $1,301
12,603
kWh
-
-
MMBtu
-
-
lb
-
-
$
09: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$13,340
Cost:
$11,000
- - - - - - $13,340 - -
-
kWh
-
-
MMBtu
-
-
lb
$13,340
-
$
10: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$1,500
Cost:
-
- - - - $1,500 300 - - -
-
kWh
-
-
MMBtu
$1,500
300
lb
-
-
$
TOTAL RECOMMENDED Savings:
$70,619
Cost:
$95,725
$16,921 195,194 $38,858 18,503 $1,500 300 $13,340 - $16,921
195,194
kWh
$38,858
18,503
MMBtu
$1,500
300
lb
$13,340
-
$
TOTAL IMPLEMENTED Savings:
$70,619
Cost:
$95,725
$16,921 195,194 $38,858 18,503 $1,500 300 $13,340 - $16,921
195,194
kWh
$38,858
18,503
MMBtu
$1,500
300
lb
$13,340
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $
Electricity Usage Natural Gas Solid Waste (haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (haz) Administrative Changes