Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 1996 |
Principal Product | Printed Circuit Boards |
NAICS | n/a |
SIC | 3571 - Electronic Computers |
Sales | $10,000,000-$50,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 97,000 |
Annual Production | 40,000 Pieces |
Production Hrs. Annual | 4,125 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $160,889 | 3,162,661 | kWh | $0.05 |
Electricity Demand | $103,039 | 6,156 | kW-months/year | $16.74 |
Electricity Fees | $4,443 | - | $ | - |
Natural Gas | $21,358 | 3,012 | MMBtu | $7.09 |
TOTAL ENERGY COSTS | $294,271 | |||
RECOMMENDED SAVINGS* | $47,690 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Solid Waste (non-haz) | Electricity Usage | Electricity Fees | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $2,319 Cost: $3,090 |
$2,319 | 15,826 | - | - | - | - |
$2,319 15,826 kWh |
- - $ |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $20,835 Cost: - |
$20,835 | 239,449 | - | - | - | - |
$20,835 239,449 kWh |
- - $ |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $3,817 Cost: $1,616 |
- | - | $3,817 | - | - | - |
- - kWh |
$3,817 - $ |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $358 Cost: $114 |
$358 | 2,931 | - | - | - | - |
$358 2,931 kWh |
- - $ |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,748 Cost: $19,039 |
$7,748 | 70,047 | - | - | - | - |
$7,748 70,047 kWh |
- - $ |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $8,071 Cost: $11,310 |
$8,071 | 72,978 | - | - | - | - |
$8,071 72,978 kWh |
- - $ |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $3,980 Cost: $9,000 |
- | - | - | - | $3,980 | - |
- - kWh |
- - $ |
$3,980 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $562 Cost: - |
- | - | - | - | $562 | 14,600 |
- - kWh |
- - $ |
$562 14,600 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $47,690 Cost: $44,169 |
$39,331 | 401,231 | $3,817 | - | $4,542 | 14,600 | $39,331 401,231 kWh |
$3,817 - $ |
$4,542 14,600 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - $ |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Solid Waste (non-haz) | Electricity Usage | Electricity Fees | Solid Waste (non-haz) |