Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 1996 |
Principal Product | Low Pressure Water Valves |
NAICS | n/a |
SIC | 3341 - Secondary Nonferrous Metals |
Sales | $10,000,000-$50,000,000 |
# of Employees | 95 |
Plant Area (Sq.Ft.) | 42,400 |
Annual Production | 1,000,000 Pieces |
Production Hrs. Annual | 2,448 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $193,689 | 3,538,980 | kWh | $0.05 |
Electricity Demand | $387,707 | 22,897 | kW-months/year | $16.93 |
Electricity Fees | $581,396 | - | $ | - |
Natural Gas | $7,278 | 982 | MMBtu | $7.41 |
TOTAL ENERGY COSTS | $1,170,070 | |||
RECOMMENDED SAVINGS* | $27,135 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $17,038 |
#|Description |
Savings Cost |
Status | Electricity Usage | Solid Waste (non-haz) | Solid Waste (haz) | Electricity Usage | Solid Waste (non-haz) | Solid Waste (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | lb | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $4,415 Cost: $4,860 |
$4,415 | 28,429 | - | - | - | - |
$4,415 28,429 kWh |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $9,302 Cost: $13,500 |
$9,302 | 88,218 | - | - | - | - |
$9,302 88,218 kWh |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $795 Cost: $600 |
$795 | 16,413 | - | - | - | - |
$795 16,413 kWh |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,233 Cost: $440 |
$1,233 | 9,086 | - | - | - | - |
$1,233 9,086 kWh |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,509 Cost: $3,663 |
$3,509 | 28,429 | - | - | - | - |
$3,509 28,429 kWh |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $4,479 Cost: $5,640 |
$4,479 | 36,342 | - | - | - | - |
$4,479 36,342 kWh |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $426 Cost: $369 |
$426 | 3,224 | - | - | - | - |
$426 3,224 kWh |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES |
Savings: $2,885 Cost: $1,450 |
- | - | - | - | $2,885 | - |
- - kWh |
- - lb |
$2,885 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE |
Savings: $91 Cost: $200 |
- | - | $91 | 1,815 | - | - |
- - kWh |
$91 1,815 lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $27,135 Cost: $30,722 |
$24,159 | 210,141 | $91 | 1,815 | $2,885 | - | $24,159 210,141 kWh |
$91 1,815 lb |
$2,885 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $17,038 Cost: $16,622 |
$14,062 | 105,510 | $91 | 1,815 | $2,885 | - | $14,062 105,510 kWh |
$91 1,815 lb |
$2,885 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | lb | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Solid Waste (non-haz) | Solid Waste (haz) | Electricity Usage | Solid Waste (non-haz) | Solid Waste (haz) |