IAC logo
IAC Assessment: SD0151
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0151
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1996
Principal Product Low Pressure Water Valves
NAICS n/a
SIC 3341 - Secondary Nonferrous Metals
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 42,400
Annual Production 1,000,000 Pieces
Production Hrs. Annual 2,448
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $193,689 3,538,980 kWh $0.05
Electricity Demand $387,707 22,897 kW-months/year $16.93
Electricity Fees $581,396 - $ -
Natural Gas $7,278 982 MMBtu $7.41
TOTAL ENERGY COSTS $1,170,070
RECOMMENDED SAVINGS* $27,135 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,038
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Solid Waste (haz) Electricity Usage Solid Waste (non-haz) Solid Waste (haz)
$ kWh $ lb $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,415
Cost:
$4,860
$4,415 28,429 - - - - $4,415
28,429
kWh
-
-
lb
-
-
lb
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$9,302
Cost:
$13,500
$9,302 88,218 - - - - $9,302
88,218
kWh
-
-
lb
-
-
lb
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$795
Cost:
$600
$795 16,413 - - - - $795
16,413
kWh
-
-
lb
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,233
Cost:
$440
$1,233 9,086 - - - - $1,233
9,086
kWh
-
-
lb
-
-
lb
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,509
Cost:
$3,663
$3,509 28,429 - - - - $3,509
28,429
kWh
-
-
lb
-
-
lb
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$4,479
Cost:
$5,640
$4,479 36,342 - - - - $4,479
36,342
kWh
-
-
lb
-
-
lb
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$426
Cost:
$369
$426 3,224 - - - - $426
3,224
kWh
-
-
lb
-
-
lb
08: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$2,885
Cost:
$1,450
- - - - $2,885 - -
-
kWh
-
-
lb
$2,885
-
lb
09: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$91
Cost:
$200
- - $91 1,815 - - -
-
kWh
$91
1,815
lb
-
-
lb
TOTAL RECOMMENDED Savings:
$27,135
Cost:
$30,722
$24,159 210,141 $91 1,815 $2,885 - $24,159
210,141
kWh
$91
1,815
lb
$2,885
-
lb
TOTAL IMPLEMENTED Savings:
$17,038
Cost:
$16,622
$14,062 105,510 $91 1,815 $2,885 - $14,062
105,510
kWh
$91
1,815
lb
$2,885
-
lb
Savings
Cost
$ kWh $ lb $ lb
Electricity Usage Solid Waste (non-haz) Solid Waste (haz) Electricity Usage Solid Waste (non-haz) Solid Waste (haz)