Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 1996 |
Principal Product | Aluminum forging for piston, wheels, and aircraft parts |
NAICS | n/a |
SIC | 3463 - Nonferrous Forgings |
Sales | $50,000,000-$100,000,000 |
# of Employees | 350 |
Plant Area (Sq.Ft.) | 105,025 |
Annual Production | 3,754,210 Pounds |
Production Hrs. Annual | 8,850 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $358,569 | 4,146,835 | kWh | $0.09 |
Electricity Demand | $112,597 | 12,383 | kW-months/year | $9.09 |
Electricity Fees | $471,166 | - | $ | - |
Natural Gas | $343,601 | 115,410 | MMBtu | $2.98 |
TOTAL ENERGY COSTS | $1,287,214 | |||
RECOMMENDED SAVINGS* | $52,462 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $45,745 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (haz) | Electricity Usage | Natural Gas | Other Liquid (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $27,898 Cost: $58,420 |
$27,898 | 266,413 | - | - | - | - |
$27,898 266,413 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2514 COVER OPEN TANKS |
Savings: $254 Cost: $364 |
- | - | $254 | 85 | - | - |
- - kWh |
$254 85 MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,872 Cost: $1,127 |
- | - | $1,872 | 624 | - | - |
- - kWh |
$1,872 624 MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS |
Savings: $1,401 Cost: $1,127 |
- | - | $1,401 | 467 | - | - |
- - kWh |
$1,401 467 MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,165 Cost: $158 |
- | - | $1,165 | 48 | - | - |
- - kWh |
$1,165 48 MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $867 Cost: $1,344 |
- | - | $867 | 196 | - | - |
- - kWh |
$867 196 MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $4,318 Cost: $1,100 |
$4,318 | 12,016 | - | - | - | - |
$4,318 12,016 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,662 Cost: $500 |
$4,662 | 44,549 | - | - | - | - |
$4,662 44,549 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,351 Cost: $2,902 |
$4,351 | 41,911 | - | - | - | - |
$4,351 41,911 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $2,577 Cost: $3,055 |
$2,577 | 21,981 | - | - | - | - |
$2,577 21,981 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,816 Cost: $779 |
$1,816 | 15,826 | - | - | - | - |
$1,816 15,826 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.1244 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS |
Savings: $1,281 Cost: - |
- | - | - | - | $1,281 | - |
- - kWh |
- - MMBtu |
$1,281 - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $52,462 Cost: $70,876 |
$45,622 | 402,696 | $5,559 | 1,420 | $1,281 | - | $45,622 402,696 kWh |
$5,559 1,420 MMBtu |
$1,281 - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $45,745 Cost: $64,223 |
$43,045 | 380,715 | $1,419 | 133 | $1,281 | - | $43,045 380,715 kWh |
$1,419 133 MMBtu |
$1,281 - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (haz) | Electricity Usage | Natural Gas | Other Liquid (haz) |