Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1997
Principal Product Thermo Plastic Injected Molded parts
NAICS n/a
SIC 3544 - Special Dies, Tools, Jigs & Fixtures
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 100,000
Annual Production 20,400,000 Pieces
Production Hrs. Annual 7,650
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $433,081 7,647,714 kWh $0.06
Electricity Demand $144,641 15,205 kW-months/year $9.51
Natural Gas $723 67 MMBtu $10.79
TOTAL ENERGY COSTS $578,445
RECOMMENDED SAVINGS* $220,421 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $144,945
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$24,903
Cost:
$21,360
$19,485 342,028 $5,418 597 - - - - - - - - $19,485
342,028
kWh
$5,418
597
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
02: 2.1224 REPLACE BOILER Savings:
$38,307
Cost:
$8,000
$88,284 1,549,238 $20,456 2,151 $(-70,433) (-6,583) - - - - - - $88,284
1,549,238
kWh
$20,456
2,151
kW-months/year
$(-70,433)
(-6,583)
MMBtu
-
-
gal
-
-
$
-
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$14,372
Cost:
-
$11,245 197,245 $3,127 329 - - - - - - - - $11,245
197,245
kWh
$3,127
329
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$4,046
Cost:
$4,000
$2,696 47,186 $1,350 142 - - - - - - - - $2,696
47,186
kWh
$1,350
142
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
05: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$3,460
Cost:
$108
$3,460 60,668 - - - - - - - - - - $3,460
60,668
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
06: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$2,460
Cost:
$900
$2,460 43,083 - - - - - - - - - - $2,460
43,083
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
07: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$1,573
Cost:
$1,800
- - - - - - - - $1,573 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$1,573
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$965
Cost:
$2,700
$755 13,189 $210 22 - - - - - - - - $755
13,189
kWh
$210
22
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
09: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$8,614
Cost:
$10,360
$5,913 103,751 $2,701 284 - - - - - - - - $5,913
103,751
kWh
$2,701
284
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,963
Cost:
$820
$1,341 23,447 $622 65 - - - - - - - - $1,341
23,447
kWh
$622
65
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
11: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$496
Cost:
-
- - - - - - $496 165 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$496
165
gal
-
-
$
-
-
$
12: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$14,696
Cost:
$9,000
- - - - - - - - - - $14,696 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$14,696
-
$
13: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$33,136
Cost:
$8,000
- - - - - - - - - - $33,136 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$33,136
-
$
14: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$23,046
Cost:
$152
- - - - - - - - - - $23,046 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$23,046
-
$
15: 4.512 CONDENSE OPERATION INTO ONE BUILDING Savings:
$48,384
Cost:
-
- - - - - - - - - - $48,384 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$48,384
-
$
TOTAL RECOMMENDED Savings:
$220,421
Cost:
$67,200
$135,639 2,379,835 $33,884 3,590 $(-70,433) (-6,583) $496 165 $1,573 - $119,262 - $135,639
2,379,835
kWh
$33,884
3,590
kW-months/year
$(-70,433)
(-6,583)
MMBtu
$496
165
gal
$1,573
-
$
$119,262
-
$
TOTAL IMPLEMENTED Savings:
$144,945
Cost:
$48,500
$44,895 787,514 $13,428 1,439 - - $496 165 - - $86,126 - $44,895
787,514
kWh
$13,428
1,439
kW-months/year
-
-
MMBtu
$496
165
gal
-
-
$
$86,126
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes