Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 1997 |
Principal Product | Plastic Products for Food Industry |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 475 |
Plant Area (Sq.Ft.) | 257,000 |
Annual Production | 32,000,000 Pounds |
Production Hrs. Annual | 7,200 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,224,852 | 20,872,509 | kWh | $0.06 |
Electricity Demand | $403,002 | 42,798 | kW-months/year | $9.42 |
Natural Gas | $159,649 | 45,521 | MMBtu | $3.51 |
TOTAL ENERGY COSTS | $1,787,503 | |||
RECOMMENDED SAVINGS* | $841,783 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $576,202 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | gal | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $50,256 Cost: $53,800 |
$39,225 | 665,006 | $11,031 | 1,171 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$39,225 665,006 kWh |
$11,031 1,171 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $241,567 Cost: $538,000 |
$187,219 | 3,174,091 | $54,348 | 5,769 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$187,219 3,174,091 kWh |
$54,348 5,769 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1224 REPLACE BOILER |
Savings: $204,328 Cost: $78,000 |
$169,920 | 2,880,715 | $43,008 | 4,800 | - | - | - | - | - | - | - | - | - | - | - | - | $(-8,600) | - |
$169,920 2,880,715 kWh |
$43,008 4,800 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - gal |
- - lb |
- - $ |
$(-8,600) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $17,052 Cost: $9,016 |
- | - | - | - | $17,052 | 4,872 | - | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$17,052 4,872 MMBtu |
- - Tgal |
- - gal |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $9,242 Cost: $1,500 |
$6,348 | 107,562 | $2,894 | 323 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$6,348 107,562 kWh |
$2,894 323 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $704 Cost: - |
$704 | 12,016 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$704 12,016 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS |
Savings: $47,553 Cost: $80,200 |
- | - | - | - | - | - | $3,770 | 2,706,007 | - | - | $23,783 | 707 | - | - | $20,000 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,770 2,706,007 Tgal |
- - gal |
$23,783 707 gal |
- - lb |
$20,000 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $13,700 Cost: $15,000 |
- | - | - | - | - | - | - | - | $13,700 | 16,000 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$13,700 16,000 gal |
- - gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $11,250 Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | $11,250 | 37,500 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - gal |
$11,250 37,500 lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $10,000 Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | $10,000 | 280,000 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - gal |
$10,000 280,000 lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $6,000 Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | $6,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - gal |
- - lb |
- - $ |
$6,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.8224 CONVERT TO LESS TOXIC HYDROCARBON CLEANERS |
Savings: $496 Cost: - |
- | - | - | - | - | - | - | - | - | - | $496 | 6,600 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
$496 6,600 gal |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $164,025 Cost: $20,000 |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | $164,025 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - gal |
- - lb |
- - $ |
$164,025 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $29,160 Cost: $1,000 |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | $29,160 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - gal |
- - lb |
- - $ |
$29,160 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $36,450 Cost: $8,000 |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | $36,450 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - gal |
- - lb |
- - $ |
$36,450 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $841,783 Cost: $804,516 |
$403,416 | 6,839,390 | $111,281 | 12,063 | $17,052 | 4,872 | $3,770 | 2,706,007 | $13,700 | 16,000 | $24,279 | 7,307 | $21,250 | 317,500 | $20,000 | - | $227,035 | - | $403,416 6,839,390 kWh |
$111,281 12,063 kW-months/year |
$17,052 4,872 MMBtu |
$3,770 2,706,007 Tgal |
$13,700 16,000 gal |
$24,279 7,307 gal |
$21,250 317,500 lb |
$20,000 - $ |
$227,035 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $576,202 Cost: $631,316 |
$233,496 | 3,958,675 | $68,273 | 7,263 | $17,052 | 4,872 | - | - | - | - | $496 | 6,600 | $21,250 | 317,500 | - | - | $235,635 | - | $233,496 3,958,675 kWh |
$68,273 7,263 kW-months/year |
$17,052 4,872 MMBtu |
- - Tgal |
- - gal |
$496 6,600 gal |
$21,250 317,500 lb |
- - $ |
$235,635 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | gal | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes |